My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 HARDESON RD 2019-01-11
>
Address Records
>
HARDESON RD
>
7301
>
7301 HARDESON RD 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 3:07:02 PM
Creation date
1/8/2019 10:42:26 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 Site Description <br /> The proposed project includes construction of the proposed FedEx Facility and related grading, <br /> paving,utilities, stormsewer and landscaping. The construction of the Hardeson Infiltration <br /> Basin is also included in this project. The project is located within Lot 1 and Tract 999 of <br /> Mountain View Business Center Division 9 and isbordered by Hardeson Rd to the west, Sievers <br /> Duecy Blvd to the south, Lot 3-Div.9 to the east, and commercial developments to the north. The <br /> site is divided into 1.82 acres for Tract 999 and 10.47 acres for development by Underwood <br /> Gartland as a FedEx facility. <br /> 2.1 Existing Conditions. <br /> The site is currently under reclamation by CEMEX. Slope reconstruction and preliminary <br /> grading shall be completed by CEMEX prior to this project. The majority of the site has been <br /> cleared of vegetation. <br /> Soil information at the project site was obtained from the Web Soil Survey website <br /> (http://websoilsurvey.nres.usda.gov/app/WebSoilSurvey.aspx)published by the United States <br /> Department of Agriculture Natural Resources Conservation Service (MRCS). The soil series <br /> underlying the tributary area is comprised of Pits and Tokul soil series. The soil is classified as a <br /> Hydrologic Group C. Appendix B of this report contains copies of the soils map. <br /> 2.2 Proposed Construction Activities <br /> The project includes construction of the FedEx Facility and the Hardeson Infiltration Basin. <br /> Construction activities will include site preparation, TESC installation, earthwork, stormsewer, <br /> water and sanitary sewer installation, paving, and building construction. The schedule and <br /> phasing of BMPs during construction is provided in Section 4.0. <br /> • <br /> UNDERWOOD GARTLAND JOHNSON 63,LLC April 2017 <br /> Stormwater Pollution Prevention Plan Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.