• Keep runoff velocities low. <br /> • Retain sediment on site. <br /> • Thoroughly monitor site and maintain all ESC measures. <br /> • Schedule major earthwork during the dry season. <br /> In addition, project management will incorporate the key components listed below: <br /> As this project site is located west of the Cascade Mountain Crest, the project will be managed <br /> according to the following key project components: <br /> Phasing of Construction <br /> • The construction project is being phased to the extent practicable in order to <br /> prevent soil erosion, and, to the maximum extent possible, the transport of <br /> sediment from the site during construction. <br /> • Re-vegetation of exposed areas and maintenance of that vegetation shall be an <br /> integral part of the clearing activities during each phase of construction, per <br /> the Scheduling BMP (C 162). <br /> Seasonal Work Limitations <br /> • From October 1 through April 30, clearing, grading, and other soil disturbing <br /> activities shall only be permitted if shown to the satisfaction of the local <br /> permitting authority that silt-laden runoff will be prevented from leaving the <br /> site through a combination of the following: <br /> Site conditions including existing vegetative coverage, slope, soil <br /> type, and proximity to receiving waters; and <br /> Limitations on activities and the extent of disturbed areas; and <br /> Proposed erosion and sediment control measures. <br /> • Based on the information provided and/or local weather conditions, the local <br /> permitting authority may expand or restrict the seasonal limitation on site <br /> disturbance. <br /> • The following activities are exempt from the seasonal clearing and grading <br /> limitations: <br /> Routine maintenance and necessary repair of erosion and sediment <br /> control BMPs; <br /> UNDERWOOD GARTLAND JOHNSON 63,LLC April 2017 <br /> Stormwater Pollution Prevention Plan Page 9 <br />