My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 HARDESON RD 2019-01-11
>
Address Records
>
HARDESON RD
>
7301
>
7301 HARDESON RD 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 3:07:02 PM
Creation date
1/8/2019 10:42:26 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Routine maintenance of public facilities or existing utility structures <br /> that do not expose the soil or result in the removal of the vegetative <br /> cover to soil; and <br /> Activities where there is 100 percent infiltration of surface water <br /> runoff within the site in approved and installed erosion and sediment <br /> control facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> • Care has been taken to coordinate with utilities, other construction projects, <br /> and the local jurisdiction in preparing this SWPPP and scheduling the <br /> construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed to assure <br /> continued performance of their intended function. Site inspections shall be <br /> conducted by a person who is knowledgeable in the principles and practices of <br /> erosion and sediment control. This person has the necessary skills to: <br /> Assess the site conditions and construction activities that could <br /> impact the quality of stormwater, and <br /> Assess the effectiveness of erosion and sediment control measures <br /> used to control the quality of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on-call at <br /> all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified in <br /> this SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> • This SWPPP shall be retained on-site or within reasonable access to the site. <br /> • The SWPPP shall be modified whenever there is a change in the design, <br /> construction, operation, or maintenance at the construction site that has, or <br /> could have, a significant effect on the discharge of pollutants to waters of the <br /> state. <br /> • The SWPPP shall be modified if, during inspections or investigations <br /> conducted by the owner/operator, or the applicable local or state regulatory <br /> UNDERWOOD GARTLAND JOHNSON 63,LLC April 2017 <br /> Stormwater Pollution Prevention Plan Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.