My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 HARDESON RD 2019-01-11
>
Address Records
>
HARDESON RD
>
7301
>
7301 HARDESON RD 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 3:07:02 PM
Creation date
1/8/2019 10:42:26 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.0 Reporting and Recordkeeping <br /> 7.1 Recordkeeping <br /> 7.1.1 Site Log Book <br /> A site log book will be maintained for all on-site construction activities and will include: <br /> • A record of the implementation of the SWPPP and other permit requirements; <br /> • Site inspections; and, <br /> • Stormwater quality monitoring. <br /> For convenience, the inspection form and water quality monitoring forms included in this <br /> SWPPP include the required information for the site log book. A separate site log book is not <br /> required and this document may also serve as a log book. However, if extensive monitoring is <br /> anticipated a separate log book may be useful. <br /> 7.1.2 Records Retention <br /> Records of all monitoring information (site log book, inspection reports/checklists, etc.), this <br /> Stormwater Pollution Prevention Plan, and any other documentation of compliance with permit <br /> requirements will be retained during the life of the construction project and for a minimum of <br /> three years following the termination of permit coverage in accordance with permit condition <br /> S5.C. <br /> 7.1.3 Access to Plans and Records <br /> The SWPPP, General Permit,Notice of Authorization letter, and Site Log Book will be retained <br /> on site or within reasonable access to the site and will be made immediately available upon <br /> request to Ecology or the local jurisdiction. A copy of this SWPPP will be provided to Ecology <br /> within 14 days of receipt of a written request for the SWPPP from Ecology. Any other <br /> information requested by Ecology will be submitted within a reasonable time. A copy of the <br /> SWPPP or access to the SWPPP will be provided to the public when requested in writing in <br /> accordance with permit condition S5.G. <br /> 7.1.4 Updating the SWPPP <br /> In accordance with Conditions S3, S4.B, and S9.B.3 of the General Permit, this SWPPP will be <br /> modified if the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br /> stormwater discharges from the site or there has been a change in design, construction, operation, <br /> or maintenance at the site that has a significant effect on the discharge, or potential for discharge, <br /> of pollutants to the waters of the State. The SWPPP will be modified within seven days of <br /> determination based on inspection(s) that additional or modified BMPs are necessary to correct <br /> problems identified, and an updated timeline for BMP implementation will be prepared. <br /> UNDERWOOD GARTLAND JOHNSON 63,LLC April 2017 <br /> Stormwater Pollution Prevention Plan Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.