Laserfiche WebLink
7.2 Reporting <br /> 7.2.1 Discharge Monitoring Reports <br /> Discharge Monitoring Report(DMR)must be submitted to Ecology's regional office no later <br /> than the 15th of the month following the end of each reporting period unless otherwise specified <br /> in the NPDES/State Waste Discharge permit as part of the Industrial Stormwater General Permit <br /> only. Construction Stormwater General Permits do not require a Discharge Monitoring Report <br /> (DMR). <br /> Water quality sampling results will be submitted to Ecology monthly on DMR forms in <br /> accordance with permit condition S5.B. If there was no discharge during a given monitoring <br /> period, the form will be submitted with the words "no discharge" entered in place of the <br /> monitoring results. If a benchmark was exceeded, a brief summary of inspection results and <br /> remedial actions taken will be included. If sampling could not be performed during a monitoring <br /> period, a DMR will be submitted with an explanation of why sampling could not be performed. <br /> 7.2.2 Notification of Noncompliance <br /> If any of the terms and conditions of the permit are not met, and it causes a threat to human <br /> health or the environment, the following steps will be taken in accordance with permit section <br /> S5.F: <br /> 1. Ecology will be immediately notified of the failure to comply. <br /> 2. Immediate action will be taken to control the noncompliance issue and to <br /> correct the problem. If applicable, sampling and analysis of any <br /> noncompliance will be repeated immediately and the results submitted to <br /> Ecology within five (5) days of becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted <br /> to Ecology within five (5) days, unless requested earlier by Ecology. <br /> Any time turbidity sampling indicates turbidity is 250 nephelometric turbidity units (NTU) or <br /> greater or water transparency is 6 centimeters or less, the Ecology regional office will be notified <br /> by phone within 24 hours of analysis as required by permit condition S5.A (see Section 5.0 of <br /> this SWPPP for contact information). <br /> In accordance with permit condition S4.F.6.b, the Ecology regional office will be notified if <br /> chemical treatment other than CO2 sparging is planned for adjustment of high pH water(see <br /> Section 5.0 of this SWPPP for contact information). <br /> 7.2.3 Permit Application and Changes <br /> In accordance with permit condition S2.A, a complete application form will be submitted to <br /> Ecology and the appropriate local jurisdiction (if applicable)to be covered by the General <br /> Permit. <br /> UNDERWOOD GARTLAND JOHNSON 63,LLC April 2017 <br /> Stormwater Pollution Prevention Plan Page 19 <br />