My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brian Borrello 12/26/2018 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2019
>
Brian Borrello 12/26/2018 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2019 9:13:47 AM
Creation date
1/10/2019 9:13:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brian Borrello
Approval Date
12/26/2018
Council Approval Date
12/12/2018
End Date
9/21/2019
Department
Administration
Department Project Manager
Carol Thomas
Subject / Project Title
Broadway Transit Corridor Art Integration
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$15,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> A. Project Description: <br /> The goal of this project is to design aesthetic enhancement elements along the North Broadway <br /> Transit Corridor between 34th Street and 7th Street.This corridor touches the Northwest, Delta, <br /> Bayside, Riverside and Port Gardner neighborhoods as well as key destinations and major <br /> attractions in the city: Everett Community College, Washington State University Everett, <br /> Providence Hospital and Angel of the Winds Arena. Community and stakeholder input are key <br /> requirements for this project. <br /> Aesthetic elements the Contractor may address, but are not limited to, are freestanding <br /> sculptural elements, the shelter panels, seating or bike racks. <br /> B. Requirements: <br /> 1. The Contractor agrees that an essential element of this agreement is the skill and creativity <br /> of the Contractor.The Contractor,therefore, shall not assign the creative or aesthetic <br /> portions of the Work to another party without the written consent of the City. <br /> 2. Contractor will conduct an initial assessment of the project which includes: an analysis of <br /> the public transit spaces, list of optimal material choices, possible approaches to the design <br /> of the bus shelter features as well as the recommended strategies for gathering stakeholder <br /> and community input. <br /> 3. An essential component that guides the aesthetic process and design of the bus shelters is <br /> community and stakeholder input.The Contractor will conduct a community meeting to <br /> gather input that informs the design. City will provide the community meeting space, <br /> promote the meeting to the community and provide refreshments. <br /> 4. The Contractor will hold a minimum of one community meeting to share the design of the <br /> aesthetic enhancements for the bus shelters. City will provide the community meeting <br /> space, promote the meeting to the community and provide refreshments. <br /> 5. Contractor will consult with Everett Transit staff to insure the design elements and materials <br /> are weatherproof/weather-resistant for the climate, durable and maintainable for transit <br /> staff. <br /> 6. The Contractor's fabrication drawings and materials selections need to be drawn and <br /> stamped by a professional engineer and approved by City of Everett engineers. <br /> 7. The Contractor will provide the city with a budget detailing materials,fabrication and <br /> installation costs, approved by Everett Transit Program Manager. <br /> 8. The Contractor will provide the City with an installation timeline, approved by Everett <br /> Transit Program Manager. <br />
The URL can be used to link to this page
Your browser does not support the video tag.