My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
415 RIVERSIDE RD 2019-02-14
>
Address Records
>
RIVERSIDE RD
>
415
>
415 RIVERSIDE RD 2019-02-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 11:35:53 AM
Creation date
1/10/2019 9:20:24 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pr4pr �nd(hin'Air owl- <br /> PUBLIC WORKS <br /> kelfAJvfle/t- <br /> MEMORANDUM <br /> TO: Riverside Business Park-Lots 2 & 4 Project Team <br /> FROM: Sabrina Fandler, Engineering/Permit Services <br /> DATE: 11/22/2016 <br /> SUBJECT: PreApp16-051Comments from Public Works (Engineering/Permit Services) <br /> PROPOSAL: Manufacturing, Distribution, and Office buildings on Lots 2 & 4 of Riverside <br /> Business Park. <br /> LOCATION: Riverside Rd-Building addresses to be determined at permitting. <br /> The following comments have been made based on a review by the Engineering/Permit Services <br /> Division of preliminary pre-application materials for the purpose of a Pre-Application meeting only. <br /> All comments, conditions, and suggestions made below or in the Pre-Application meeting are <br /> preliminary only and may change once the project is in formal review after an application has been <br /> submitted. The following comments may only be a partial collection of notes, and additional <br /> comments may be made verbally in the Pre-Application meeting. <br /> 1. Construction permits, inspections and final approvals are required for this project from City of <br /> Everett Permit Services. <br /> 2. A Public Works Permit is required for this project. Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing site parking layout, landscaping, utilities, storm drainage, temporary construction <br /> erosion and sedimentation control, and all required improvements in the public right-of-way. <br /> Public Works Department approval of these drawings is required prior to any permits being <br /> issued. All improvements shall be completed, approved and warranted before the Occupancy <br /> Permit is issued/final approval is granted. <br /> 3. Contact the City's Stormwater reviewer with questions while preparing plans for permit review <br /> (Jane Zimmerman: JZimmerman@everettwa.gov). <br /> • The City will be adopting new stormwater standards to be effective on January 1, 2017. <br /> • Stormwater shall be managed in accordance with the Stormwater Site Plan (Comprehensive <br /> Hydraulics Report) for the Port of Everett Riverside Business Park stamped and signed by <br /> Hugh Kuyper on 10/19/2016 and applicable City stormwater management standards. This <br /> report was approved by the City's stormwater reviewer, Jane Zimmerman on 10/24/2016. <br /> • The stormwater runoff treatment system for the site shall be designed to treat stormwater in <br /> accordance with City standards for a downstream tailwater elevation in the Snohomish River <br /> equal to the MHHW elevation, plus one foot. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.