Laserfiche WebLink
6 <br /> PUBLIC WORKS <br /> MEMORANDUM <br /> TO: Chris Miller, Blueline, 425-250-7249 <br /> FROM: Sabrina Fandler, Engineering/Permit Services, 425-257-7813 <br /> DATE: 4/11/2017 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Site Work for Riverside Business Park Lots 2 and 4. <br /> LOCATION: 405 Riverside Rd (Lot 4) & 415 Riverside Rd(Lot 2) <br /> PERMIT#: PW1702-028 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following <br /> revisions should be made and/or the following conditions must be met: <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your plans <br /> accordingly, prior to resubmitting to the Permit Services Counter. If you have any questions <br /> regarding the comments/redlines or need anything further, please directly contact this project's <br /> Public Works plans reviewer, Sabrina Fandler, at 425-257-7813 or SFandler@everettwa.gov. <br /> Please note that these comments are compiled from Public Works reviewers for the Public <br /> Works (civil) plans only. The applicant team may receive a separate comment letter from the <br /> Building Department and/or the Planning Department. <br /> a. Please resubmit the following items to the Permit Services Counter with your <br /> resubmittal once all requested revisions have been made: <br /> i. Transmittal Sheet: (1) available online at https://everettwa.gov/Permits or at the <br /> Permit Counter-2nd Floor, 3200 Cedar Street. <br /> ii. Plans: (4) sets of revised plans plus original City Markups. <br /> iii. Drainage Report: (2) copies of revised drainage report <br /> iv. Easement Form: (1) copy of easement form for water easement with legal <br /> description and exhibit attached for review. For an electronic version of this <br /> form, please email Sabrina at SFandler@everettwa.gov. Signing of this form <br /> must be notarized and can take place at the permit counter if needed, typically <br /> done at the time of permit issuance for convenience to the owner. <br /> v. Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate form <br /> filled out for the City to use to calculate the Public Works Permit Fee. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:OOpm-4:OOpm(closed between 12:OOpm-1:OOpm for lunch). <br /> b. In general, please note all comments listed below as well as any additional redlines <br /> marked on the plans. <br /> Page 1 of 4 <br />