Laserfiche WebLink
f <br /> Table of Contents <br /> Introduction <br /> Scope of Amendment 2 <br /> Figures <br /> Revised Figure 2 —Developed Conditions Basin Map (Ponds) <br /> (New) Figure 2A—Developed Conditions Lot Drainage Planning <br /> Information <br /> Revised Figure 15 —Developed Conditions Basin Map (Pumps) <br /> (New) Figure 15A—Developed Conditions Drainage Concept Lots 2 & 4 <br /> (New) Figure 16 —RBP 100-YR Flow and Pump Capacities—Rational <br /> Method. <br /> (New) Figure 17— Overpass Water Quality Exhibit. <br /> (New) Figure 17A through 17D —Calculations to Support the Proposed <br /> diverted flows from the overpass for pre-treatment before drainage into the <br /> pond. <br /> (New) Figure 18 —RBP 8th Street with Lot 3 driveway Pump Summary — <br /> Rational Method. Summary of storm water flow events calculated for 8th <br /> Street development. <br /> (New) Figure 18A— 18D: 8t` Street 2, 10, 25 & 100-year Events—Drainage <br /> Runoff Calculations (Rational Method) <br /> (New) Figure 19 and 19A—RBP—Lot 5 Storm Drain Allotments. <br /> Riverside Business Park <br /> April 12,2017 <br /> KPFF,Amendment 2 Page 2 lot '/- <br /> \` <br />