Laserfiche WebLink
EXHIBIT B <br /> COMPENSATION <br /> LUMP SUM <br /> The City shall pay Service Provider Eighteen Thousand Four Hundred dollars ($18,400.00) upon <br /> completion of the Work, subject to the maximum stated in 411(D)of this agreement. A breakdown of <br /> the compensation is as follows: <br /> Labor <br /> No. Building Address Area SF Subtotal <br /> 1 Building No.1 Public Works Administration 3200 Cedar Street 56,600 $ 1,500 <br /> 2 Building No.2 -MVD Main Repair Shop 3200 Cedar Street 10,125 $ 375 <br /> 3 Building No.2B-MVD Small Vehicle Repair 3200 Cedar Street 8,000 $ 375 <br /> 4 Building No.3 - Panama Warehouse 3200 Cedar Street 12,712 $ 750 <br /> 5 Building No.4- Public Works Shop 3200 Cedar Street 21,000 $ 1,125 <br /> 6 Annex No.1- Creamery 3101 Cedar Street 15,071 $ 750 <br /> 7 Annex No.2 - Insurance Building 3110 Cedar Street 4,944 $ 375 <br /> Hazmat Verification(7 Buildings) $ 750 <br /> Draft AGFI Report $ 1,600 <br /> Technical Review $ 960 <br /> TOTAL $ 8,560 <br /> Samples <br /> ACM PLM Pt Mold <br /> No. Building PLM Ct Lead FAA Mold Air Bulk <br /> 1 Building No.1 60 10 30 <br /> 2 Building No.2 20 3 15 <br /> 3 Building No.2B 20 3 15 <br /> 4 Building No.3 30 3 15 <br /> 5 Building No.4 40 6 20 <br /> 6 Annex No.1 30 6 12 <br /> 7 Annex No.2 30 6 15 6 4 <br /> Sample Subtotal 230 37 122 6 4 <br /> Rate 5d TAT $ 10 $ 55 $ 15 $ 75 $ 50 <br /> Subtotal $ 2,300 $ 2,035 $ 1,830 $ 450 $ 200 $ 6,815 <br /> Mark-up (.15) $ 1,025 <br /> TOTAL $ 7,840 <br /> Assessment Contingency Fee(If Required) <br /> Additional Services that may be needed based upon any issues that surface during the assessment as <br /> approved only in writing and signed by an authorized City representative. <br /> Assessment Contingency Fee-TOTAL $ 2,000 <br /> Page 1 of 1 <br />