Laserfiche WebLink
8. List any environmental information you know about that has been prepared, or will be <br />prepared, directly related to this proposal. <br />• Prefrminary Site Assessment RepoR for the Washington Natural Gas <br />Company Property Located at 3630 Railway Avenue (Enviros, 1993) <br />• Underground Storage Tank Removal at a Fonner Mnnufactured Gas Plant <br />Site in Everett, Washington (RETEC, 1994) <br />• Underground Storage Tank N2 Remova[ at a Former Manufactured Gas <br />Plant Site in Everett, Washington (RETEC, 1994) <br />• Renredial Investigation Repon for the Former Manufactured Gas Plant Site, <br />Everea, Washington (RETEC, 1996) <br />• /nterim Action Activities at the Fonner Manufactured Gas Plant Site, <br />Everett, Washington (RETEC, 1996) <br />• Feasibility Study for a Former Manufactured Gas Plant Site, Everett, <br />Washington (RETEC, 1996) <br />• Clea�tup Action Plan for a Former Manufactured Gas Plant in Everett, <br />Waslrington (RETEC, 1996) <br />9. Do you know whether applicstions are pending for governmental approval of other propasals <br />directly affecting the property covered by your proposal? If yes, explain. <br />No other applicatioati are pending <br />10. List any government approvals or permits that will be needed for your proposal, if known. <br />A JARPA permit <br />2 <br />