My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3630 RAILWAY AVE PUGET SOUND ENERGY 2018-01-01 MF Import
>
Address Records
>
RAILWAY AVE
>
3630
>
PUGET SOUND ENERGY
>
3630 RAILWAY AVE PUGET SOUND ENERGY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2019 8:57:46 AM
Creation date
1/15/2019 8:52:34 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
3630
Tenant Name
PUGET SOUND ENERGY
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL CHECKLIST <br />A. BACKGROUND <br />1. Name of proposed project, if applicable: <br />Clean-up uf a Former Manufactured Gas Plant (MGP) <br />2. Name of applicant: <br />PugetSound Energy <br />3. Address and phone number of applicant and contact person: <br />Applicant: Puget Sound Energy <br />815 Mercer Avenue <br />Seatde, WA 98109 <br />Atm. Mr. Barry Lombard <br />(206)224-2138 <br />ConUct Person: Remediation Technologies, Inc. <br />1011 SW Klickitxt Way <br />Seattle, WA 98134 <br />Atm. Mr. Joseph Giblxns <br />(206)624-9349 <br />4. Date checklist prepared: <br />luly 25, 1997 <br />5. Agency requesting checklist: <br />City of Everett <br />Planning and Communiry Development <br />6. Proposed timing or schedule (including phacing, if applicable): <br />'llie pmject will he executed in 2 phases. Phace 1 wiil consist of excavation, barrier conswction and <br />installation of moniroring wells xnd is scheduled for the fall of 1997. Phase 11 will imolve the <br />installxtion of air sparging or other groundwarer remediation wells anci may �xcur i to 5 years <br />following Phace 1. Implementation of Phatie II will he contingent on resulcc of grounJwater <br />monitoring. <br />7. Do you have any plans for future additions, expansion, or further activity related to or <br />connected with this proposal? If }•es, explain. <br />Phatie II of the project may cewr I to 5 years xfter completion of Phase I depending on grounciwater <br />monitoring resultti. <br />
The URL can be used to link to this page
Your browser does not support the video tag.