My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> CITY OF EVER ETT SPECIAL PROVISIONS <br /> I1-07.18(5)F Pollution Liability <br /> The Contractor shall provide a Pollution Liability policy, providing coverage for <br /> I claims involving bodily injury, property damage (including loss of use of tangible <br /> property that has not been physically injured), cleanup costs, remediation, <br /> disposal or other handling of pollutants, including costs and expenses incurred in <br /> I the investigation, defense, or settlement of claims arising out of: <br /> Contractor's operations related to this project; <br /> Remediation, abatement, repair, maintenance or other work with lead-based paint <br /> I or materials containing asbestos; and <br /> Transportation of hazardous materials away from any site related to this project. <br /> Such Pollution Liability policy shall provide the following minimum coverage: <br /> I $2,000,000 each loss and annual aggregate <br /> 1-07.18(5)G Professional Liability <br /> I The Contractor, its Subcontractor and its design consultant providing construction <br /> management, value engineering, or other design-related non-construction <br /> professional services shall provide evidence of Professional Liability insurance <br /> ' covering professional errors and omissions. Such policy shall provide the <br /> following minimum limits: <br /> $2,000,000 per Claim <br /> I If the scope of such design-related professional services includes work related to <br /> pollution conditions; the Professional Liability insurance shall include Pollution <br /> Liability coverage. <br /> I If insurance is on a claims made form, its retroactive date, and that of all <br /> subsequent renewals, shall be no later than the effective date of this Contract. <br /> 1-07.18(5)H Builder's Risk <br /> I If the Project includes construction of a structure, the Contractor shall maintain <br /> property insurance under an "All Risk Builder's Risk" form in an amount equal to <br /> the value of the structure in a form acceptable to the City. The structure shall <br /> I have All Risk Builder's Risk Insurance inclusive of earthquake and flood subject to <br /> customary industry deductibles. <br /> 1-07.20 Patented Devices, Materials, and Processes <br /> IDelete the first paragraph of 1-07.20 and substitute the following: <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> I <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> actions of any nature for, or on account of the use of any patented devices, materials, <br /> or processes. <br /> 1 1-07.23 Public Convenience and Safety <br /> Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br /> I Nothing contained in this Contract is intended to create any third-party beneficiary <br /> rights in favor of the public or any individual utilizing the facilities being constructed or <br /> improved under this Contract. <br /> I 1-07.23(1) Construction Under Traffic <br /> Revise the third sentence of the second paragraph to read as follows: <br /> I <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> I <br /> WO No—UP3684 SP—91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.