My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Work falls seven calendar days or more behind the reviewed Preliminary Schedule, the <br /> Contractor agrees that, at its sole cost and expense, it will take all actions necessary to <br /> return the Project to the accepted schedule. These actions may include the following: , <br /> a. Increase labor in quantities and crafts. <br /> b. Increase the number of working hours per shift, shifts per working day, <br /> working days per week, or the amount of Equipment, or any combination of <br /> the foregoing. <br /> c. Reschedule activities. <br /> If requested by the City's Representative, the Contractor shall prepare a proposed <br /> schedule revision demonstrating a plan to make up the lag in progress and insure <br /> completion of the Work within the Contract Time. Ali actions taken to return the Project <br /> to the accepted schedule are at the Contractor's expense. <br /> The Contractor shall pay all costs incurred by the City that result from the Contractor's <br /> action to return the Project to its accepted schedule, including, but not limited to, <br /> additional, overtime, or third party inspection, design and construction management <br /> service costs. Contractor agrees that City shall deduct such charges from payments <br /> due the Contractor. It is further understood and agreed that none of the services <br /> performed by the City's Representative in monitoring, reviewing and reporting Project I <br /> status and progress shall relieve the Contractor of responsibility for planning and <br /> managing construction Work in conformance with the construction schedule. <br /> 1-08.4(2) Special Construction Constraints , <br /> (******) <br /> Provide City accepted disinfected and pressurized fire and domestic service lines to <br /> Cocoon House, 3530 Colby Avenue, by Milestone 1 noted in Division C - Contract , <br /> Documents. <br /> Coordinate with PSE regarding PSE gas main relocation and final patching. <br /> Refer to 1-08 0(2) for work hours. <br /> Refer to 1-07.23(1) for construction under traffic and 1.07.23(1)A for general traffic <br /> requirements. <br /> Because Schedule B — Shoulder Stabilization work is more weather sensitive, the City <br /> will issue a separate Notice to Proceed March 1, 2019 at the earliest and April 1, 2019 <br /> at the latest for that work. <br /> Provide notice in accordance with 8-20.3(1) of these Special Provisions to City of <br /> Everett Traffic Department before cutting induction loop wiring. <br /> Pay particular attention to maximum length allowed between sampling points on new <br /> water main in accordance with 7-09.3(24)H FINAL FLUSHING AND TESTING. <br /> Upon completion of pipe installation and trench backfilling to specifications, promptly <br /> restore street, driveway and sidewalk surfaces using Temporary Pavement Patch in <br /> accordance with Section 5-06.3(6) TEMPORARY PAVEMENT PATCHING and permit <br /> public use and access for City inspection activities. <br /> Parking spaces are normally very limited in most areas of the project and the <br /> Contractor will be required to cooperate with the City in resolving parking issues. In <br /> general, businesses and residents who rely on on-street parking and are displaced by <br /> the construction shall be given priority for the nearest available parking location. The <br /> Contractor's employees may be required to park their personal vehicles away from the <br /> area of construction. <br /> I <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP—102 ' <br />