My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-08.5 Time for Completion <br /> Delete all of 1-08.5 and substitute the following: <br /> 1 <br /> 1-08.5(1) General <br /> The Contractor shall complete all physical Contract Work within the number of <br /> "working days" stated in the Contract Provisions or as extended by the Engineer in <br /> Iaccordance with Section 1-08.8. Every day will be counted as a "working day" <br /> unless it is a nonworking day or an Engineer determined unworkable day. A <br /> nonworking day is defined as a Saturday, a Sunday, a whole or half day on which <br /> I <br /> the Contract specifically prohibits Work on the critical path of the Contractor's <br /> approved progress schedule, or one of these holidays: January 1, the third <br /> Monday of January, the third Monday of February, Memorial Day, July 4, Labor <br /> I <br /> Day, November 11, Thanksgiving Day, the day after Thanksgiving, and Christmas <br /> Day. When any of these holidays fall on a Sunday, the following Monday shall be <br /> counted a nonworking day. When the holiday falls on a Saturday, the preceding <br /> I <br /> Friday shall be counted a nonworking day. The days between December 25 and <br /> January 1 will be classified as nonworking days. <br /> An unworkable day is defined as a half or whole day the Engineer declares to be <br /> I unworkable because of weather or conditions caused by the weather that <br /> prevents satisfactory and timely performance of the Work shown on the critical <br /> path of the Contractor's approved progress schedule. Other conditions beyond the <br /> I <br /> control of the Contractor may qualify for an extension of time in accordance with <br /> Section 1-08.8. <br /> Contract Time shall begin on the effective date of the Notice to Proceed. The <br /> I <br /> Contract Documents may specify another starting date for Contract Time, in which <br /> case. Contract Time will begin on the starting date the Contract Documents <br /> specify. <br /> I <br /> Each working day shall be charged to the Contract as it occurs, beginning on the <br /> effective date of the Notice to Proceed, unless otherwise provided in the Contract <br /> Documents, until the Contract Work is physically complete. Each week the <br /> I <br /> Engineer will provide the Contractor a statement that shows the number of <br /> working days: (1) charged to the Contract the week before; (2) specified for the <br /> physical completion of the Contract; and (3) remaining for the physical completion <br /> of the Contract. The statement will also show the nonworking days and partial or <br /> Iwhole day the Engineer declares as unworkable. Within 14 calendar days after <br /> the date of each statement, the Contractor shall file a written protest of any <br /> alleged discrepancies in it. To be considered by the Engineer, the protest shall be <br /> I <br /> in sufficient detail to enable the Engineer to ascertain the basis and amount of <br /> time disputed. By not filing such detailed protest in that period, the Contractor <br /> shall be deemed as having accepted the statement as correct. If the Contractor <br /> ' elects to work ten hours a day and four days a week (a 4-10 schedule) and the <br /> fifth day of the week in which a 4-10 shift is worked would ordinarily be charged as <br /> a working day then the fifth day of that week will be charged as a working day <br /> I whether or not the Contractor works on that day. <br /> The Engineer will give the Contractor written notice of the Physical Completion <br /> Date for all Work the Contract requires. That date shall constitute the Physical <br /> I <br /> Completion Date of the Contract, but shall not imply the City's acceptance of the <br /> Work or the Contract. <br /> The Engineer will give the Contractor written notice of the Completion Date of the <br /> I <br /> Contract after all the Contractor's obligations under the Contract have been <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> I <br /> WO No—UP3684 SP—103 <br />