Laserfiche WebLink
ICITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> Table of Contents <br /> I <br /> I Table of Contents i <br /> ADVERTISEMENT FOR BIDS 1 <br /> DIVISION B - BID ITEM DESCRIPTIONS 3 <br /> ISchedule A—Watermain 3 <br /> Schedule B — Shoulder Stabilization 14 <br /> U DIVISION P - PROPOSAL 19 <br /> BID SCHEDULE 91 <br /> PROPOSAL SIGNATURE SHEET 25 <br /> ISUBCONTRACTORS FORM 26 <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 27 <br /> I NON-COLLUSION AFFIDAVIT 28 <br /> BID DEPOSIT 29 <br /> BID BOND 29 <br /> IDIVISION C - CONTRACT 33 <br /> PAYMENT BOND 37 <br /> PERFORMANCE BOND 39 <br /> I DIVISION 1 — GENERAL REQUIREMENTS 41 <br /> General Description and Location of Project (******) 41 <br /> 111 Design Engineer (******) 41 <br /> Standard Specifications (******) 41 <br /> I 1-01 DEFINITIONS AND TERMS 42 <br /> 1-01.3 Definitions 42 <br /> 1-02 BID PROCEDURES AND CONDITIONS 47 <br /> I 1-02.1 Prequalifications of Bidders 47 <br /> mResponsibility r ******/( <br /> Bidder Criteria 47 <br /> 1-02.2 Plans and Specifications 47 <br /> I 1-02.4 Examination of Plans, Specifications, and Site of Work 48 <br /> 1-02.5 Proposal Form 49 <br /> 1-02.6 Preparation of Proposal 49 <br /> I1-02.7 Bid Deposit 50 <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification 50 <br /> I 1-02.9 Delivery of Proposal 51 <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal 51 <br /> 1-02.12 Public Opening of Proposals 51 <br /> I 1-02.13 Irregular Proposals 51 <br /> 1-02.14 Disqualification of Bidders 52 <br /> 1-02.15 Pre-Award Information 52 <br /> I Watermain Replacement"T" Table of Contents - October 10, 2018 <br /> WO No. —UP3684 SP -i <br /> I <br />