My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-03 AWARD AND EXECUTION OF CONTRACT 53 I <br /> 1-03.1 Consideration of Bids 53 <br /> 1-03.2 Award of Contract 54 I <br /> 1-03.3 Execution of Contract 54 <br /> 1-03.4 Contract Bond 54 <br /> 1-03.5 Failure to Execute Contract 55 <br /> 1-03.6 Return of Bid Deposit 55 <br /> 1-03.7 Judicial Review 55 <br /> 1-04 SCOPE OF THE WORK 55 <br /> 1-04.1 Intent of the Contract 55 <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and Addenda 56 <br /> 1-04.3 Reference Information 57 <br /> 1-04.4 Changes 57 <br /> 1-04.4 Changes 57 <br /> 1-04.5 Procedure and Protest by the Contractor 58 <br /> 1-04.5 Notice by Contractor (******) 58 <br /> 1-04.6 Variation in Estimated Quantities 60 <br /> 1-04.7 Differing Site Conditions (Changed Conditions) 60 <br /> 1-05 CONTROL OF WORK 61 <br /> 1-05.1 Authority of the Engineer 61 <br /> 1-05.1 City (******) 61 <br /> 1-05.2 Authority of Assistants and Inspectors 61 <br /> 1-05.2 City's Representative (******) 61 <br /> 1-05.3 Working Drawings 62 <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes 65 <br /> 1-05.6 Inspection of Work and Materials 67 <br /> 1-05.7 Removal of Defective and Unauthorized Work 67 <br /> 1-05.10 Guarantees 68 <br /> 1-05.11 Final Inspection 69 <br /> 1-05.11 Final Inspections and Operational Testing (******) 69 <br /> 1-05.12 Final Acceptance 70 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 71 <br /> 1-05.14 Cooperation With Other Contractors 71 <br /> 1-05.16 Water and Power (******) 72 <br /> 1-05.17 Oral Agreements (******) 72 <br /> 1-05.18 Contractor (******) 72 <br /> 1-05.19 City-Contractor Coordination (******) 75 <br /> 1-06 CONTROL OF MATERIAL 76 <br /> 1-06.1 Approval of Materials Prior to Use 76 <br /> 1-06.2 Acceptance of Materials 77 <br /> 1-06.3 Manufacturer's Certificate of Compliance 77 <br /> 1-06.4 Handling and Storing Materials 78 <br /> I <br /> 1-06.6 Recycled Materials 78 <br /> Watermain Replacement"T" Table of Contents - October 10, 2018 <br /> WO No.-UP3684 SP -ii <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.