My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Standard Drawings, Standard Specifications and these Special Provisions, in conformity <br /> with the lines and locations shown on the Plans. <br /> Bid Item 39 - Temporary Pavement Patch <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for Temporary Pavement Patch shall be by the square yard placed within the <br /> sawcut neatlines limits of dimensions defined in the Work, descriptions for other bid items, <br /> shown on the Plans, or COE Standard Drawings, or as otherwise approved by the <br /> Engineer. , <br /> The unit price per square yard for Temporary Pavement Patch in accordance with Standard <br /> Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans shall be <br /> full compensation for all work necessary to complete Temporary Pavement Patch in <br /> accordance with these specifications. <br /> Regardless of duration or sequence of work, this item will be measured and paid one time. <br /> Bid Item 40 - Crushed Surfacing Top Course I <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for crushed surfacing top course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br /> details or COE Standard Drawings or as otherwise approved by the Engineer. Crushed <br /> Surfacing Top Course material placed exceeding "neatline" quantities without advance111 <br /> authorization by the Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, <br /> and equipment necessary to furnish, haul. stockpile, place, grade, and compact imported <br /> crushed surfacing top course for the Work as required, from a Contractor supplied source in <br /> accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing top course also includes all costs for controlling I <br /> moisture content. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing <br /> soils to attain proper elevations, compaction of native subgrade soils, as well as to <br /> uniformly spread and compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br /> crushed surfacing and while spreading and compacting the material. <br /> Payment for crushed surfacing top course will be by the ton of material placed and I <br /> approved by the Inspector. <br /> Bid Item 41 - Cement Concrete Pavement Base (H.E.S.) for Trench Patch <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for Cement Concrete Pavement, (H.E.S.) shall be per square yard as <br /> delineated by the Contractor and approved by the Inspector prior to removal. <br /> The unit price per square yard for Cement Concrete Pavement Base (H.E.S), shall be full <br /> compensation for all materials, tools, labor and equipment necessary to complete the Work <br /> in accordance with the Plans, COE Standard Drawings, Section 5 of the Standard , <br /> Specifications and 5-06.3 and 5-06.3 of these Special Provisions. <br /> Bid Item 42 - HMA, CL 1/2" PG 64-22 for Permanent Trench Patch <br /> Watermain Replacement"T" Division B—BID DESCRIPTIONS October 10, 2018 <br /> WO No.—UP3684 SP -12 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.