I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> (d) When 5% of the total original contract amount is earned from other bid items, <br /> 50% of the amount bid for mobilization, or 5% of the total original contract <br /> amount, whichever is the least, will be paid. <br /> (e) When 10% of the total original contract amount is earned from other bid items. <br /> 100% of the amount bid for mobilization, or 10% of the total contract amount, <br /> whichever is the least, will be paid. <br /> Upon completion of all work on the project, payment of any amount bid for mobilization in <br /> excess of 10% of the total original contract amount will be paid. <br /> Bid Item 50 - Surveying <br /> Measurement and Payment: Lump Sum (LS) <br /> Measurement for surveying will be the ratio of actual pipe installed and backfilled to the <br /> total quantity of pipe listed in the Proposal. <br /> The lump sum bid for surveying includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments materials, and other equipment necessary for <br /> the setting and monitoring the location, elevation, alignment and grade of the Work as <br /> specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br /> and the Plans. <br /> The lump sum bid item also includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments, materials and other equipment necessary for <br /> verifying the rim and invert elevations, prior to construction, of all existing manholes and <br /> ' pipes where connections are to be made. <br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all <br /> labor, tools, survey instruments, materials and other equipment necessary for obtaining the <br /> "as constructed" location and elevations of the Work, in particular, sewer pipe invert <br /> elevations and other information necessary for production of the Record Drawing (As- <br /> Constructed) documents meeting the requirements defined in RECORD DRAWINGS of <br /> these Special Provisions. <br /> Bid Item 51 - SPCC Plan <br /> Measurement and Payment: Lump Sum (LS) <br /> The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan <br /> includes, but is not limited to, all costs associated with complying with the requirements of <br /> Section 1-07(15).1 of the Standard Specification. <br /> Bid Item 52 - Force Account <br /> Measurement and Payment: Force Account (FA) <br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br /> ACCOUNT; except, as modified below. <br /> The Force Account bid item has been included for specific miscellaneous work items listed <br /> below and for any additional work directed by the Engineer that is not required by the <br /> original Contract and to address changed conditions or unanticipated work. The amount <br /> indicated in the Proposal for this bid item is to provide a common bid amount. The actual <br /> amount paid under this bid item may vary from no payment to the full amount of the bid <br /> item. Work performed under this bid item will be initiated with a work directive issued by <br /> the Engineer. <br /> ' In lieu of the preceding prescribed method of determining payment for Force Account work, <br /> payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br /> Contractor prior to beginning the Force Account work. <br /> Watermain Replacement"T" Division B-BID DESCRIPTIONS October 10, 2018 <br /> WO No.-UP3684 SP -15 <br /> I <br />