My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement of beam guardrail and beam guardrail with long posts will be by the linear <br /> 1 foot measured along the line of the completed guardrail, including expansion section, and <br /> will also include the end section for F connections. <br /> Payment for Beam Guardrail Type _ shall be compensation if full for all labor, materials <br /> and equipment necessary to provide satisfactorily installed guardrail as specified in the <br /> Standard Specifications and these Special Provisions. <br /> Bid Item 56 - Beam Guardrail Non-Flared Terminal <br /> Measure and Payment: Unit Price per Each (EA) <br /> Measurement of beam guardrail non-flared terminal will be by each terminal installed. <br /> Payment for Beam Guardrail Non-Flared Terminal shall be compensation if full for all labor, <br /> materials and equipment necessary to provide satisfactorily installed guardrail terminal as <br /> specified in the Standard Specifications and these Special Provisions. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> i <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> Watermain Replacement"T" Division B—BID DESCRIPTIONS October 10, 2018 <br /> WO No.—UP3684 SP-17 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.