Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Schedule of Values: Allocation of Contract Sum to items of Work as described in 1- <br /> 09.9 PAYMENTS of these Special Provisions. <br /> Shall: Required conduct. I <br /> Shown: Refers to information presented on the Plans, with or without reference to the <br /> Plans. <br /> Specify: Refers to information described, shown. noted or presented in any manner in <br /> the Contract. <br /> Submittals: The information required by the Contract Documents provided by <br /> Contractor to the City's Representative or City. <br /> Total Float: The amount of time a given activity or path of activities may be delayed <br /> before it will affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> wheelchairs, and equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> Contractor's Overhead costs realized by the result of reduced Project or Contractor <br /> billings, or both, due to any reason whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the Proposal. , <br /> 1 <br /> I <br /> 1 <br /> I <br /> Watermain Replacement "T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP—46 <br />