Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-02 BID PROCEDURES AND CONDITIONS <br /> 1-02.1 Pre qualifications of Bidders <br /> Delete 1-02.1 and substitute the following: <br /> 1-02.1 Bidder Responsibility Criteria <br /> I (******) <br /> 1-02.1(1) Mandatory Bidder Responsibility Criteria <br /> (******) <br /> Bidder shall meet mandatory responsibility criteria in accordance with RCW <br /> 39.04.350(1). The City may require the Bidder to submit documentation demonstrating <br /> compliance with the criteria under this 1-02.1(1). The Bidder must: <br /> ' 1. Registration. Have a current certificate of registration as a contractor in compliance <br /> with chapter 18.27 RCW, which must have been in effect at the time of Bid <br /> submittal; and <br /> ' 2. UBI. Have a current Washington Unified Business Identifier (UBI) number; and <br /> 3. State Requirements. If applicable: <br /> ' a. Have Industrial Insurance (workers' compensation) coverage for the bidder's <br /> employees working in Washington, as required in Title 51 RCW; <br /> b. Have a Washington Employment Security Department number, as required in <br /> Title 50 RCW; and <br /> c. Have a Washington Department of Revenue state excise tax registration <br /> number, as required in Title 82 RCW. <br /> 4. Disqualification. Not be disqualified from bidding on any public works contract <br /> under RCW 39.06.010 or 39.12.065(3). <br /> 5. Certification of Wage Compliance. Within the three-year period immediately <br /> preceding the date of the bid solicitation, not have been determined by a final and <br /> binding citation and notice of assessment issued by the department of labor and <br /> industries or through a civil judgment entered by a court of limited or general <br /> jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of <br /> chapter 49.46, 49.48, or 49.52 RCW. <br /> 6. Apprentices. If the Project is subject to the apprenticeship utilization requirements <br /> in RCW 39.04.320, not have been found out of compliance by the Washington state <br /> apprenticeship and training council for working apprentices out of ratio, without <br /> appropriate supervision, or outside their approved work processes as outlined in <br /> their standards of apprenticeship under chapter 49.04 RCW for the one-year period <br /> immediately preceding the date of the bid solicitation. <br /> 1-02.1(2) Supplemental Bidder Responsibility Criteria <br /> (******) <br /> This Project will not be subject to supplemental bidder responsibility criteria. <br /> 1-02.2 Plans and Specifications <br /> ' Delete all paragraphs in 1-02.2 and substitute the following: <br /> Information as to where Bid Documents can be obtained or reviewed will be found in <br /> the Call for Bids (Advertisement for Bids) for the Work. <br /> IAfter Award of the Contract, the Contractor will receive up to six sets of the reduced <br /> Plans (11" x 17") and accompanying Special Provisions. In addition, the Owner will <br /> supply up to three sets of full size plans (22" x 34"). All Plans and Special Provisions <br /> ' will be conformed with addenda unless Contractor requests otherwise. <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> ' WO No—UP3684 SP—47 <br />