My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICITY OF EVERETT SPECIAL PROVISIONS <br /> I2-04.3 Construction Requirements 140 <br /> 2-04.4 Measurement 140 <br /> I 2-04.5 Payment 140 <br /> 2-07 WATERING 140 <br /> 2-07.3 Construction Requirements 140 <br /> I2-07.4 Measurement 141 <br /> 2-07.5 Payment 141 <br /> 2-09 STRUCTURE EXCAVATION 141 <br /> II2-09.2 Materials 141 <br /> 2-09.3 Construction Requirements 141 <br /> I 2-09.4 Measurement 142 <br /> 2-09.5 Payment 142 <br /> 2-11.3 Construction Requirements 142 <br /> I 2-11.4 Vacant 143 <br /> 2-11.4 Measurement 143 <br /> 2-11.5 Payment 143 <br /> IDIVISION 4 - BASES 145 <br /> 4-04 BALLAST AND CRUSHED SURFACING 145 <br /> I 4-04.1 Description 145 <br /> 4-04.3 Construction Requirements 145 <br /> 4-04.4 Measurement 145 <br /> I 4-04.5 Payment 145 <br /> 4-06 ASPHALT TREATED BASE 145 <br /> 4-06.4 Measurement 146 <br /> I 4-06.5 Payment 146 <br /> DIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS 147 <br /> 5-04 HOT MIX ASPHALT 147 <br /> I5-04.1 Description 147 <br /> 5-04.2 Materials 147 <br /> I 5-04.3 Construction Requirements 149 <br /> 5-04.4 Measurement 168 <br /> 5-04.5 Payment 168 <br /> I 5-06 PAVEMENT PATCHING (******) 168 <br /> 5-06.1 Description 168 <br /> 5-06.2 Materials 168 <br /> I5-06.3 Construction Requirements 168 <br /> 5-06.4 Measurement 170 <br /> 5-06.5 Payment 170 <br /> IDIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> WATERMAINS, AND CONDUITS 171 <br /> I 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 171 <br /> 7-08.1 Description 171 <br /> 7-08.2 Materials 171 <br /> I Watermain Replacement "T" Table of Contents - October 10, 2018 <br /> WO No.-UP3684 SP -v <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.