My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-08.3 Construction Requirements 171 <br /> 7-08.4 Measurement 173 <br /> 7-08.5 Payment 173 <br /> 7-09 WATERMAINS 173 <br /> 7-09.1 Description 173 <br /> 7-09.2 Materials 174 <br /> 7-09.3 Construction Requirements 174 <br /> 7-09.4 Measurement 180 <br /> 7-09.5 Payment 180 111 <br /> 7-12 VALVES FOR WATERMAINS 180 <br /> 7-12.1 Description 180 <br /> 7-12.2 Materials 180 <br /> 7-12.3 Construction Requirements 180 <br /> 7-12.4 Measurement 181 J <br /> 7-12.5 Payment 181 <br /> 7-14 HYDRANTS 181 <br /> 7-14.1 Description 181111 <br /> 7-14.2 Materials 181 <br /> 7-14.3 Construction Requirements 182 <br /> 7-14.4 Measurement 182 <br /> 7-14.5 Payment 182 <br /> 7-15 SERVICE CONNECTIONS 182 I <br /> 7-15.1 Description 182 <br /> 7-15.2 Materials 183 <br /> 7-15.3 Construction Requirements 183 <br /> 7-15.4 Measurement 184 <br /> 7-15.5 Payment 184 <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION 185 <br /> 8-01 EROSION CONTROL 185 <br /> 8-01.1 Description 185 <br /> 8-01.3 Construction Requirements 185 <br /> 8-01.4 Measurement 187 <br /> 8-01.5 Payment 188 <br /> 8-02 ROADSIDE RESTORATION 188 <br /> 8-02.1 Description 188 <br /> 8-02.2 Materials 188 <br /> 8-02.3 Construction Requirements 188 <br /> 8-02.4 Measurement 190 <br /> I <br /> 8-02.5 Payment 190 <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS 190 <br /> 8-04.1 Description 190 <br /> 8-04.2 Materials 190 <br /> 8-04.3 Construction Requirements 190 <br /> Watermain Replacement"T" Table of Contents - October 10, 2018 <br /> WO No.- UP3684 SP -vi <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.