My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I8-04.4 Measurement 191 <br /> 8-04.5 Payment 191 <br /> I 8-05 VACANT 191 <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 191 <br /> 8-06.1 Description 191 <br /> I8-06.2 Materials 191 <br /> 8-06.3 Construction Requirements 191 <br /> I 8-06.4 Measurement 192 <br /> 8-06.5 Payment 192 <br /> 8-13 MONUMENTCASES 192 <br /> I 8-13 SURVEY MONUMENTS AND CASES (******) 192 <br /> 8-13.1 Description 192 <br /> 8-13.2 Materials 192 <br /> I 8-13.3 Construction Requirements 193 <br /> 8-13.4 Measurement 193 <br /> 8-13.5 Payment 193 <br /> I8-14 CEMENT CONCRETE SIDEWALKS 193 <br /> 8-14.2 Materials 193 <br /> I 8-14.3 Construction Requirements 194 <br /> 8-14.4 Measurement 195 <br /> 8-14.5 Payment 195 <br /> II 8-22 PAVEMENT MARKING 195 <br /> 8-22.1 Description 195 <br /> 8-22.4 Measurement 195 <br /> I8-22.5 Payment 195 <br /> DIVISION 9 - MATERIALS 197 <br /> 0 9-03 AGGREGATES 197 <br /> 9-03.6 Vacant 197 <br /> 9-03.6 Aggregates for Asphalt Treated Base (ATB) 197 <br /> I 9-03.22 Sand Backfill for Pipe Zone (******) 198 <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING 198 <br /> 9-14.1 Topsoil 198 <br /> II 9-14.2 Seed 198 <br /> 9-14.6 Plant Materials 199 <br /> 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 199 <br /> I9-23.2 Liquid Membrane-Forming Concrete Curing Compounds 199 <br /> 9-23.6 Chemical Admixtures for Concrete 199 <br /> I 9-29 ILLUMINATION, SIGNAL, ELECTRICAL 199 <br /> 9-29.2 Junction Boxes, Cable Vaults, and Pull Boxes 199 <br /> 9-29.3 Fiber Optic Cable, Electrical Conductors, and Cable 200 <br /> I 9-30 WATER DISTRIBUTION MATERIALS 200 <br /> 9-30.1 Pipe 200 <br /> 9-30.2 Fittings 200 <br /> I Watermain Replacement"T" Table of Contents October 10, 2018 <br /> WO No.-UP3684 SP -vii <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.