My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> such claim. including all attorney's fees and any other costs incurred by the <br /> indemnified parties relative to any such claim. <br /> The Contractor shall coordinate its work with other contractors and utility companies 1 <br /> that may have facilities in the Project area and cooperate with them. He shall also <br /> coordinate its activities with the City; and no water mains, individual water services, <br /> street, or private driveways may be closed off without a minimum of five working days <br /> notice to the City and the private property owner. Should the property owner or the <br /> City have adequate reason, as determined by the Engineer, to avoid access or water <br /> service shutoff at the scheduled time, the Contractor shall reschedule its work to meet <br /> the new condition. <br /> Final grading to subgrade and subgrade preparation in those areas disturbed by the <br /> utilities companies shall be the responsibility of the Contractor and included in the <br /> street construction and no additional compensation will be paid. <br /> The Contractor shall cooperate with the utility companies and their subcontractors and <br /> so conduct its operations that the necessary construction of their facilities can be <br /> accomplished to the mutual satisfaction of the City of Everett and the utility companies. <br /> Supplement Section 1-05 by adding the following new subsections: <br /> 1-05.16 Water and Power I <br /> (******) <br /> The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> and water necessary for the performance of the Work, unless the Contract includes power <br /> and water as a pay item. <br /> Contractor shall pay all power and water costs until Substantial Completion, whether such <br /> power or water is provided by temporary or permanent facilities. City shall not be liable for <br /> any costs or Delays arising out of or caused by the availability or lack of availability of <br /> permanent power or utilities. <br /> 1-05.17 Oral Agreements <br /> (******) <br /> No oral agreement or conversation with any officer, agent, or employee of the City. either <br /> before or after execution of the Contract, shall affect or modify any of the terms or <br /> obligations contained in any of the documents comprising the Contract. Such oral <br /> agreement or conversation shall be considered as unofficial information and in no way <br /> binding upon the City, unless subsequently put in writing and signed by the City111. <br /> . <br /> 1-05.18 Contractor <br /> (******) <br /> 1-05.18(1) Contractor's Representative 111 <br /> The Contractor shall notify the Owner in writing of the name of the person who will act <br /> as the Contractor's representative, will have the authority to act in matter relating to <br /> this Contract, and will be delegated with authority to act as the Contractor's emergency <br /> contact. This person shall have authority to carry out the provisions of the Contract <br /> and to supply materials, Equipment, tools and labor without delay for the performance <br /> of the Work. <br /> Contractor shall employ and keep on site on a full time basis personnel experienced in <br /> the management of construction of projects of this size and type. These shall include, <br /> but not be limited to, a project manager and superintendent. Neither the Contractor's <br /> project manager nor the superintendent shall have supervisory responsibility for other <br /> projects for the Contractor while assigned to this Project. Contractor shall employ and <br /> assign such additional, full time office, support and engineering personnel to support <br /> Watermain Replacement "T" Division 1 -GENERAL REQUIREMENTS October 10, 2018 <br /> WO No-UP3684 SP-72 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.