I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Ior materials or articles ordinarily available on the open market, or contracts for <br /> transportation or transmission of intelligence. <br /> I 1-05.18(3)1 Public Safety and Convenience <br /> The Contractor shall conduct its work so as to ensure the least possible <br /> obstruction to traffic and inconvenience to the general public, business, <br /> I organizations and residents in the vicinity of the Work and to reasonably protect <br /> persons and property. No roads or street shall be closed to the public except with <br /> the permission of the City's Representative and the proper governmental authority. <br /> I Fire hydrants on or adjacent to the Work shall be accessible to firefighting <br /> equipment. Temporary provisions shall be made by the Contractor for the use of <br /> sidewalks, private and public driveways and proper functioning of gutters, sewer <br /> I inlets, drainage ditches and culverts, irrigation ditches and natural water courses. <br /> 1-05.19 City-Contractor Coordination <br /> (******) <br /> 1 1-05.19(1) Suggestions to Contractor <br /> Nothing in these Contract Documents requires the City's Representative to provide the <br /> Contractor with direction or advice on how to do the Work, construction practices, or <br /> I means and methods. If the City's Representative approves, suggests or recommends <br /> any construction practice, means, method or manner for doing the Work or producing <br /> materials, the approval or recommendation shall not: (A) guarantee that following the <br /> I method or manner will result in compliance with the Contract Documents; (B) relieve <br /> the Contractor of any risks or obligations under the Contract Documents; or (C) create <br /> liability by the City to the Contractor. <br /> I Suggestions as to the plans or methods of accomplishing the Work or Contract <br /> requirements by the City or the City's Representative to the Contractor but not <br /> specified or required, if adopted or followed by the Contractor in whole or in part, shall <br /> I be used at the risk and responsibility of the Contractor. The City and the City's <br /> Representative assume no responsibility therefore and in no way will be held liable for <br /> any defects in the Work which may result from or be caused by use of such plan or <br /> I method of Work. <br /> 1-05.19(2) Meetings with City <br /> The Contractor shall have its duly authorized representative attend periodic <br /> 1 informational meetings with the City's Representative and City staff, as reasonably <br /> required by the City. <br /> Contractor, City, and City's Representative shall meet as often as determined by the <br /> I City's Representative, but no less often than once each month. The purpose of the <br /> meeting is to review Project status in relation to the construction schedule; review <br /> value of Work completed during the previous month; and, if applicable, review <br /> I Contractor's plans to return Project status to that required by the schedule. If <br /> requested by the City or City's Representative, the Contractor shall submit a written <br /> progress report within five days following this meeting, comprising: <br /> I The current construction schedule indicating percent complete, actual completion or <br /> start dates since the previous review, the estimated remaining duration for each activity <br /> in progress, Schedule of Values update, and narrative summary. <br /> I Reasons any activities are behind schedule and the corrective steps being taken. <br /> 1-05.19(3) Cooperation with Others <br /> The Contractor agrees to permit entry to the work site by the City, its employees or <br /> Iother contractors performing Work on behalf of the City. The Contractor shall afford to <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP—75 <br />