Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> the City, other contractors and their employees, reasonable facilities and cooperation <br /> and arrange its work and dispose of its materials in such a manner as to not interfere <br /> with the activities of the City or of others upon the site of Work. The Contractor shall <br /> promptly make good Contractor-caused injury or damage to persons or property that <br /> may be sustained by other contractors or employees of the City. The Contractor shall <br /> join its Work to that of others and perform its Work in proper sequence in relation to <br /> that of others. <br /> If requested by the Contractor, the City will arrange meetings with other contractors <br /> performing Work on behalf of the City to plan coordination of construction activities. <br /> The Contractor shall inform itself of the planned activities of other contractors and will <br /> coordinate its Work with the other contractors. <br /> Contractor shall notify the City of problems, interference or any difficulty with other <br /> contractors or workers engaged by the City. The Notice shall be sufficiently prompt <br /> and specific so as to allow the City to mitigate or avoid increased costs, time of <br /> performance, damages or injury. Contractor's failure to provide such Notice in a timely <br /> way shall be deemed a waiver and release of any and all Contract Claims relating to, <br /> arising out of, or caused by, any alleged interference, difficulty or problem with another <br /> contractor or worker engaged by the City. <br /> 1-06 CONTROL OF MATERIAL <br /> Supplement Section 1-06 as follows: <br /> References to materials shall also mean Contractor furnished Equipment, if any, as <br /> specified in these Special Provisions. <br /> 1-06.1 Approval of Materials Prior to Use <br /> Revise the first paragraph of 1-06.1 to read as follows: <br /> Prior to use, Contractor shall notify the Engineer of all proposed materials. Contractor <br /> may use the Qualified Product List (QPL) and the Aggregate Source Approval (ASA) <br /> Database. Contractor shall use the Request for Approval of Material (RAM) form. <br /> Supplement 1-06.1 by adding the following: <br /> Provide product data, when specified, in accordance with 1-05.3(1) SUBMITTALS of <br /> these Special Provisions for inspecting, testing, operating, or maintaining Equipment <br /> and materials supplied as part of the Work. Unless otherwise specified, such data <br /> shall be provided at the time the referenced material or Equipment is delivered to the <br /> job site. Provide data as specified and include, unless otherwise specified, but not be <br /> limited to shop drawings, erection drawings, reinforcing steel schedules, testing and <br /> adjusting instructions, operations manuals, maintenance procedures, parts lists, and <br /> record drawings. Provide data as part of the Work under this Contract and its <br /> acceptability will be determined by the City in its sole discretion. <br /> Further supplement 1-06.1 by adding the following: <br /> 1-06.1(5) Requests for Substitution <br /> (******) <br /> The City will not usually consider a substitution for material or Equipment specified by <br /> brand name or manufacturer or sole-sourced. <br /> Only the Contractor may offer materials or Equipment of equal or better quality and <br /> performance as a substitution for those specified. The Contractor shall make <br /> substitution offers in writing to the City's Representative in accordance with 1-05.3(1) <br /> SUBMITTALS of these Special Provisions. The substitution offer must include <br /> sufficient data to enable the City's Representative to assess the acceptability of the <br /> material or Equipment for the particular application and requirements. The City and <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP-76 , <br />