My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 12/27/2018
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 12/27/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:32:06 AM
Creation date
1/15/2019 9:47:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
12/27/2018
Council Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Watermain Replacement T
Public Works WO Number
UP3684
Tracking Number
0001600
Total Compensation
$2,106,730.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 3/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/23/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 6/19/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 111 If the scope of Work in this Contract includes Work at the City of Everett Water <br /> Filtration Plant or the Waste Water Pollution Control Facility, Contractor shall comply <br /> with the requirements of the Washington Department of Labor & Industries for such <br /> work including, but not limited to, Chapter 296-67 WAC. All costs associated or <br /> incurred in complying with these regulations or any other regulations listed above are <br /> 1 included in the Contractor's Proposal. <br /> In cases of conflict between different safety regulations, the more stringent regulation <br /> shall apply. <br /> The Washington State Department of Labor and Industries shall be the sole and <br /> paramount administrative agency responsible for the administration of the provisions of <br /> the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> The Contractor shall maintain at the project site office, or other well-known place at the <br /> project site, all articles necessary for providing first aid to the injured. The Contractor <br /> shall establish, publish, and make known to all employees, procedures for ensuring <br /> immediate removal to a hospital, or doctor's care, persons, including employees, who <br /> may have been injured on the project site. Employees should not be permitted to work <br /> on the project site before the Contractor has established and made known procedures <br /> 1 for removal of injured persons to a hospital or a doctor's care. <br /> The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br /> the Contractor's plant, appliances, and methods, and for any damage or injury <br /> resulting from their failure, or improper maintenance, use, or operation. The <br /> Contractor shall be solely and completely responsible for the conditions of the project <br /> site, including safety for all persons and property in the performance of the Work. This <br /> requirement shall apply continuously, and not be limited to normal working hours. The <br /> required or implied duty of the Engineer to conduct construction review of the <br /> Contractor's performance does not, and shall not, be intended to include review and <br /> adequacy of the Contractor's safety measures in, on, or near the project site. <br /> Supplement 1-07.1 by adding the following: <br /> 1-07.1(1) Noise <br /> Work within 500 feet of residential properties between the hours of 10:00 p.m. and <br /> 7:00 a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on <br /> weekends or holidays are subject to noise control requirements if the work generates <br /> decibel levels of greater than 55 db(A). Apply for a Noise Variance a minimum of 30 <br /> days prior to performing work and pay $100.00 application fee. Use the following link <br /> to obtain the latest information on noise variance requirements <br /> https://www.everettwa.gov/1547/Temporary-Noise-Variance-Requests. Typical <br /> requirements include, and not limited to, broadband backup alarms on all equipment <br /> requiring a backup alarm, anti-tail gate slamming devices, dump truck bed liners, and <br /> sawcutting, vacuum excavation, pavement breaking and loading export haul noise <br /> must be done between the hours of 7:00 a.m. and 10:00 p.m. during weekdays and <br /> between 8:00 a.m and 6:00 p.m. on weekends. Appendix E contains the City of <br /> Everett's Noise Ordinance for Bidder's reference. <br /> Approval to continue Work during these hours may be revoked at any time the <br /> Contractor exceeds the City's noise control regulations or complaints are received from <br /> the public or adjoining property owners regarding the noise from the Contractor's <br /> operation. The Contractor shall have no claim for damages or delays should such <br /> permission be revoked for these reasons. <br /> 1-07.2 State Taxes <br /> 1 Delete 1-07.2 and substitute the following: <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP-79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.