Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-06.4 Handling and Storing Materials <br /> Supplement 1-06.4 by adding the following: <br /> Contractor shall store materials and Equipment so as to insure the preservation of their <br /> quality and fitness for the Work. Store Equipment and materials at location that <br /> facilitates inspection. The Contractor shall be responsible for damages, loss or <br /> casualty occurring to materials and Equipment until Final Acceptance. <br /> 1-06.6 Recycled Materials <br /> Delete 1-06.6 and its subsections and substitute the following: <br /> Make best effort to utilize recycled materials in the construction of the project as <br /> detailed in elsewhere in the Standard Specifications and these Special Provisions. <br /> Prior to Physical Completion report the quantity of recycled materials utilized in the <br /> construction of the project for each of the items listed in Section 9-03.21. Include hot <br /> mix asphalt, recycled concrete aggregate, recycled glass, steel furnace slag and other <br /> recycled materials (e.g. utilization of on-site material and aggregates from concrete <br /> returned to the supplier). Provide report on DOT form 350-075 Recycled Materials <br /> Reporting. <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC I <br /> 1-07.1 Laws to be Observed <br /> Revise 1-07.1 by replacing "WSDOT" with "City" in the next to the last sentence of <br /> paragraph three. <br /> Supplement 1-07.1 by adding the following: <br /> The Contractor shall be in compliance with all applicable standards, orders, or <br /> requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)), <br /> Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and <br /> Environmental Protection Agency Regulations (40 CFR Part 15). (Contracts, <br /> subcontracts, and subgrants of amounts in excess of $100,000). t <br /> The Contractor shall comply with mandatory standards and policies relating to energy <br /> efficiency that are contained in the state energy conservation plan issued in <br /> compliance with the Energy Policy and Conservation Act (Pub. L. 94-163). <br /> The City advises all general contractors and subcontractors that numerous Federal, <br /> State, and Local regulations exist that could affect the procedures used in the <br /> completion of this project. The City advises each prospective Contractor that they are <br /> responsible to be aware of and comply with all applicable statutes and regulations. It <br /> is recommended that each Contractor contact the local office of the following agencies <br /> for a list of applicable regulations and requirements that might affect the <br /> implementation of this project: <br /> • Federal Environmental Protection Agency <br /> • Washington Department of Health <br /> • Washington Department of Ecology <br /> • Washington Department of Fisheries <br /> • Washington Department of Wildlife <br /> • Washington Department of Labor & Industries <br /> • Puget Sound Air Pollution Control Agency <br /> • Municipal Building Department <br /> • Municipal Planning Department <br /> • Municipal Public Works Department <br /> 111 <br /> Watermain Replacement"T" Division 1 —GENERAL REQUIREMENTS October 10, 2018 <br /> WO No—UP3684 SP-78 I <br />