My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200-33 <br /> Evergreen Branch Library Expansion 2017-008 <br /> I2. Payment for partially completed lump sum items will be as mutually agreed. If the parties cannot <br /> agree,the Owner's Representative will determine the amount of the adjustment of Contract Sum <br /> I <br /> in accordance with 9.5.ADJUSTMENT OF CONTRACT SUM; <br /> 3. To the extent not paid for by the Contract Sum for the completed units of Work,the Owner will <br /> pay as part of the adjustment of Contract Sum those direct costs necessarily and actually incurred <br /> ' by the Contractor in reasonable anticipation of performing the Work that has been deleted or <br /> terminated; <br /> 4. The total payment for any one item in the case of a deletion or partial termination shall not exceed <br /> ' the Bid price as modified by approved Change Orders less the estimated cost,including Overhead <br /> and profit,to complete the Work and less any amount paid to the Contractor for the item; <br /> 5. If the entire remainder of the Contract is terminated, the total payment to the Contractor shall not <br /> 111 <br /> exceed the total Contract Sum as modified by approved Change Orders less those amounts paid to <br /> the Contractor before the effective date of the termination; and <br /> 6. No claim for damages of any kind or for loss of anticipated profits or consequential damages on <br /> Ideleted or terminated Work will be allowed because of termination or Change Order. Contract <br /> Time shall be adjusted as the parties agree. If the parties cannot agree, the Owner's <br /> Representative will determine the adjustment of Contract Time. <br /> IAcceptable materials ordered by the Contractor prior to the date the Work was terminated or deleted will <br /> either be purchased from the Contractor by the Owner at the actual cost and shall become the property of <br /> the Owner,or the Owner will reimburse the Contractor for the actual costs of returning these materials to <br /> I <br /> the Suppliers. <br /> If Contractor disagrees with the adjustment of Contract Sum determined by the Owner's Representative, <br /> Contractor may submit a Contract Claim for the difference between the amount determined by the <br /> I <br /> Owner's Representative and the amount sought by the Contractor. <br /> Contractor shall not be entitled to anticipated profits on deleted,terminated,or uncompleted Work. <br /> 1 9.3. CHARGES TO CONTRACTOR <br /> The Contractor shall pay the Owner on demand everything charged to it under the terms of this Contract. <br /> Such charges may be deducted by the Owner from money due or to become due to the Contractor under <br /> I <br /> the Contract. The Owner may recover such charges from the Contractor or from its surety. <br /> Contractor agrees to pay the costs of overtime or excessive inspection and observation costs incurred by <br /> the Owner. Overtime inspection shall include inspection required during Saturdays, Sundays, City <br /> Iholidays and weekdays,in excess of 40 hours per week or outside of normal working hours and <br /> inspections or observations that result in an inspector or observer working more than forty hours in a <br /> week. Costs of such overtime or excessive inspection or observation include architecture,engineering, <br /> I construction management services, inspection,general supervision and Overhead expenses which are <br /> directly chargeable to the overtime or excessive work. Contractor agrees that Owner will deduct such <br /> charges from payments due the Contractor. In the event the Owner by Change Order requires the <br /> I <br /> Contractor to work in excess of the established schedule of working hours,the Owner will not charge the <br /> Contractor for inspection costs associated therewith. <br /> 9.4. COMPENSATION TO OWNER FOR TIME EXTENSION <br /> IThe Owner shall be compensated by the Contractor for the actual costs to the Owner of engineering, <br /> inspection,general supervision,right-of-way costs,permit fees, Overhead expenses,and any other <br /> ascertainable direct costs to the Owner that are directly chargeable to the Work and which accrue during <br /> I <br /> the period of such extension. The actual costs do not include charges for final inspection and preparation <br /> of the final payment by the Owner. <br /> I <br /> I <br /> 00 7200 - 33 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.