My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200 - 35 <br /> Evergreen Branch Library Expansion 2017-008 <br /> I9.5.3 Unabsorbed and Extended Overhead <br /> Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall be calculated using <br /> Ithe Eichleay formula by: <br /> 1. Determining the pro-rata amount of Overhead allocable to the subject project. This is <br /> accomplished by multiplying Overhead costs by the ratio of the subject project's billings to the <br /> ' Contractor's overall billings during the overall period of the subject Project's performance. The <br /> result is"Allocable Overhead." <br /> I a. Any additional and unresolved direct cost claims presented by the Contractor concurrently <br /> with any request for Extended and/or Unabsorbed Overhead shall not be included in <br /> determining the ratio of the subject Project billings to overall Contractor billings for the <br /> period of project performance. <br /> I2. Determining the daily amount of Allocable Overhead for the subject Project. This is <br /> accomplished by dividing the Allocable Overhead for the subject Project by the number of days <br /> (as contractually defined)of Contract performance. The result is the Daily Rate of Allocable <br /> I <br /> Overhead. <br /> 3. Determining the gross amount of potential additional compensation for Home Office Overhead <br /> I due to the project extension. This is accomplished by multiplying the Daily Rate of Allocable <br /> Overhead by the number of days of project extension caused solely by the Owner. This results in <br /> the Gross Amount of Additional Home Office Overhead Compensation. <br /> I 4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for any <br /> additional contribution for Overhead received by the Contractor on any Change Orders that are <br /> being presented and resolved concurrently with the subject calculation for Unabsorbed and/or <br /> Extended Home Office Overhead. The necessary adjustment would be to reduce the Gross <br /> I <br /> Amount of Additional Home Office Overhead Compensation by any additional compensation for <br /> Overhead included in any direct cost claims being resolved concurrently with any claim for <br /> Extended and/or Unabsorbed Home Office Overhead. <br /> IContractor shall not receive compensation for cost of use of equity capital. <br /> 9.6. FORCE ACCOUNT <br /> I <br /> If Work or materials are to be paid for by Force Account,payment amounts will be determined and <br /> Contractor shall contemporaneously prepare,keep and maintain records segregated and allocated by time, <br /> location and item of Work in compliance with this subsection. Such records must be contemporaneously <br /> I countersigned by the Owner or the Owner's Representative(or its designee). Any records not <br /> countersigned by the Owner or Owner's Representative shall be excluded from the calculation of payment <br /> under this subsection. <br /> I The payments provided for herein shall be full payment for all Work done on a Force Account basis. The <br /> payment shall be deemed to cover all expenses of every nature,kind,and description, including all <br /> Overhead expenses,profit,occupational tax and any other Federal or State revenue acts,premiums on <br /> I public liability and property damage insurance policies, and for the use of small tools and equipment for <br /> which no rental is allowed. <br /> No Contract Claim for Force Account shall be allowed except upon written order by the Owner's <br /> I Representative for Extra Work prior to the performance of the Extra Work.No Extra Work shall be <br /> construed as Force Account Work that can be measured under the Specifications and paid for at the unit <br /> prices or lump sum named in the Contract. <br /> I The Owner's Representative shall compute the amount and costs of any Work to be paid by Force <br /> Account,and the amount certified by the Owner's Representative shall be final as provided in 3.2. <br /> OWNER'S REPRESENTATIVE. <br /> I <br /> I <br /> 00 7200 - 35 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.