Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 7300 - 2 <br /> Evergreen Branch Library Expansion 2017-008 <br /> PART 5 -WORKING HOURS <br /> 5.1 General Contractor will be required to provide a project schedule that clearly defines ■ <br /> each phase of work including planned facility closure(s), length of time area(s) <br /> is/are to be closed, and projected reopening of affected area(s). <br /> A. Contractor will coordinate with Owner to schedule approximately five (5) to seven (7) <br /> days into project schedule for city forces to pull low voltage wire (to occur after drywall <br /> and before ceiling grid installation) and to install hearing loop work. Additional hearing <br /> loop work will be needed in designated locations prior to carpet installation. <br /> 5.2 Work Hours: The Contractor shall provide work schedule. Facility will not be occupied <br /> during construction. The Contractor will have full access to facility. <br /> A. The City has established regulations for control of noise in residential zoned property. I <br /> For the purpose of regulating potential disruptive or annoying noise, Ordinance No. <br /> 1556-89 states that all residential zoned land fall within Noise Control No. 1. <br /> 1. Therefore, it should be noted that under the City's Noise Ordinance, construction <br /> related noise is limited to the following hours: <br /> a. 7:00 AM to 10:00 PM on weekdays <br /> b. 8:00 AM to 6:00 PM on weekends and state recognized holidays I <br /> 5.3 Be aware that all construction sites will be monitored and violators are subject to fines. <br /> 5.4 Construction contractors are responsible for notifying subcontractors of the City's noise <br /> regulations. <br /> 5.5 (Discussion of altering business operating schedule will be determined at Pre- <br /> Construction Meeting) Other hours may be considered on a limited basis without <br /> interruption of Owner's normal operations (Owner will determine if proposed work may <br /> interrupt Owner's operations). All requests for working hours other than those stated <br /> above shall be made exclusively through the Owner's Representative. <br /> PART 6 - RESTROOMS I <br /> 6.1 Contractor Access: The Contractor shall provide portable toilets to be positioned in <br /> locations where they will not pose a health problem or obstruct entry into the facility. <br /> Ensure portable toilets have the ability to be locked and secured as to prevent <br /> unauthorized use and vandalism. <br /> PART 7 - OWNER OCCUPATION AND OPERATIONS <br /> I <br /> 00 7300 - 2 SPECIAL CONDITIONS <br /> I <br />