My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 1100 - 3 <br /> I <br /> Evergreen Branch Library Expansion 2017-008 <br /> A. The Owner will pay the cost of the general plan review and building permit. The <br /> Contractor shall be responsible to obtain and pay the cost of various other permits and <br /> I connection fees required such as mechanical, plumbing and electrical permits or <br /> connection fees and such shall be included in the Bid. <br /> 1 1.6 CODES AND STANDARD SPECIFICATIONS <br /> A. All construction shall be in accordance with the International Building Code, Current <br /> IAdopted Edition. <br /> B. All construction shall be in accordance with the Uniform Mechanical Code, and the <br /> IUniform Plumbing Code, latest editions. <br /> C. All construction shall be in conformance with the WSDOT/APWA Standard <br /> ISpecifications and Standard Plans, latest edition. <br /> D. All construction shall be in conformance with the City of Everett Design and Construction <br /> Standards and Specifications, latest edition. <br /> IE. All work shall comply with applicable requirements of Snohomish County. <br /> I F. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as Commercial Standard Federal Specifications, a trade association <br /> standard, or other similar standard, shall comply with the requirements of the latest <br /> I revision thereof, and any amendment or supplement thereto in effect on the date of <br /> Invitation for Bids, except as limited to type, class or grade, or modified in such <br /> references. All work shall conform to the standard referred to, except as modified in <br /> these specifications and the drawings. <br /> 1.7 CONTRACTOR'S USE OF PREMISES <br /> IA. The Contractor shall assume full responsibility for protection and safekeeping of products <br /> under this Contract. <br /> IB. The Contractor shall obtain and pay for use of additional storage for work areas needed <br /> for operations. <br /> I1.8 CHECKING PLANS AND SPECIFICATIONS <br /> I A. PRIOR SUBMISSION OF BIDS: The Contractor shall report any discrepancies or <br /> omissions in the plans and/or specifications to the Architect for a decision prior to the <br /> Submission of Bids. <br /> IB. RESOLUTION OF CONFLICTS: Where there is conflict between the plans and the <br /> specifications in regard to materials, equipment, sizes, numbers or locations, the Owner <br /> shall be the sole judge in resolving the conflict. <br /> I <br /> I01 1100 - 3 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.