My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 1200 - 1 <br /> 111 Evergreen Branch Library Expansion 2017-008 <br /> SECTION 01 1200 - MULTIPLE CONTRACT SUMMARY <br /> I <br /> PART 1 - GENERAL <br /> 1 1.1 RELATED DOCUMENTS <br /> IA. The Contract Documents, Drawings and Specifications apply to this Section. <br /> I1.2 SUMMARY <br /> A. The owner has hired Artists to perform work on the owners' behalf. This section includes <br /> I a summary of the Artists' contracts for the described work including responsibilities and <br /> coordination between Contractor and Artists. <br /> B. Work to construct hanging art sculpture, placement of the artwork be completed by an <br /> I Artist under a separate contract with the City. The contractor is required to assist the <br /> Artist during the construction of the hanging art as specified below. <br /> I C. Removal and installation of the artwork provided by the artist under a separate contract <br /> with the City. The Contractor is required to assist the Artist during the removal and/or <br /> installation. <br /> 1.3 DEFINITIONS <br /> I A. Definitions used in this paragraph are not intended to negate the meaning of other terms <br /> used in the contract documents. <br /> IB. "Artist" is a person performing work on behalf of the owner under a separate contract. <br /> C. "Contractor" is the Contractor awarded the contract for the described work. <br /> I1.4 QUALITY ASSURANCE <br /> I A. During the construction of the hanging art artwork, an inspection shall take place after <br /> each major task (phase) has been completed. Inspections shall be conducted by <br /> representatives of the following parties: <br /> I 1. Owner <br /> 2. Artist <br /> 3. Contractor <br /> I B. Upon completion of each major task, the party responsible for the work shall call a <br /> meeting to inspect the completed work. <br /> I C. No inspection is complete unless all parties have signed and approved the work. Work <br /> on the next phase of construction will not commence until all parties are satisfied with <br /> the work and have signed the inspection form. <br /> 1 01 1200 - 1 MULTIPLE CONTRACT SUMMARY <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.