Laserfiche WebLink
City of Everett 01 2973 - 5 <br /> ' Evergreen Branch Library Expansion 2017-008 <br /> 1. Labor. <br /> ' 2. Equipment. <br /> 3. Material. <br /> 4. Subcontractor. <br /> 5. Overhead and Profit. <br /> ' 6. Total Cost. <br /> B. Show total sum for each cost category as well as total cost for each work activity. <br /> PART 2 - PRODUCTS (Not Used) <br /> ' PART 3 - EXECUTION (Not Used) <br /> ' END OF SECTION 01 2973 <br /> I <br /> I <br /> 01 2973 - 5 (Rev. 2/25/2018) SCHEDULE OF VALUES <br />