My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 3119 - 2 <br /> Evergreen Branch Library Expansion 2017-008 !,I <br /> a. Origination. <br /> b. Required cost breakdown. <br /> c. Inclusion in monthly pay application. 1 <br /> d. Time extension. <br /> 5. Payments: <br /> a. Schedule of Values. <br /> b. Progress payment review at Project Site. <br /> c. Monthly progress payment cut-off date. <br /> 6. Site Visits: <br /> a. Dates and times of Engineer's visits. <br /> b. Engineer's visit report. <br /> 7. Record Documents. <br /> 8. Finish and Coordination. <br /> 9. Notice to Proceed. <br /> 10. Other Topics as Appropriate to Project. <br /> D. Engineer will record minutes and issue copies to all in attendance. 1, <br /> 1.2 PROGRESS MEETINGS <br /> A. Meeting Location: Contractor's project field office, unless otherwise agreed. <br /> B. Attendance shall include Owner, Architect, Contractor, Project Superintendent, and 111 <br /> others as appropriate to agenda for each meeting. <br /> C. The Contractor shall: 1 <br /> 1. Prepare agenda and administer progress meetings, and specially called meetings <br /> throughout work progress. <br /> 2. Preside at meetings. <br /> 3. Record minutes; include all significant proceedings and decisions. <br /> 4. Reproduce and distribute copies of minutes within three (3) days of each meeting <br /> to all meeting participants. <br /> 5. Ascertain that work is prosecuted consistently with contract documents and <br /> construction schedules. <br /> D. SUGGESTED AGENDA: I <br /> 1. Review and approve minutes of previous meeting. <br /> 2. Review work progress since previous meeting. <br /> 3. Review plans for progress for succeeding work period. <br /> 4. Review construction schedule. <br /> 5. Present corrective measures and procedures to regain project schedule, as <br /> applicable. 111 <br /> 6. Present field observations, problems, and conflicts. <br /> 7. Discuss problems impeding progress schedule. <br /> 8. Review Quantity Control. <br /> 9. Review submittal schedules; present methods to expedite as required. <br /> 10. Review off-site fabrication. <br /> 11. Review delivery schedules. <br /> 12. Coordinate work. <br /> 13. Review proposed changes for: <br /> 01 3119 - 2 PROJECT MEETINGS 111 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.