My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3216 - 1 <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 01 3216 - CONSTRUCTION PROGRESS SCHEDULE <br /> I <br /> PART 1 - GENERAL <br /> 1.1 CONSTRUCTION SCHEDULE <br /> A. The Contractor shall prepare a construction schedule showing all tasks required to <br /> perform the work. Schedule shall show all tasks performed by all trades that is required <br /> to perform work within the contract time. The Schedule shall include sufficient time for <br /> cleaning, punch list review and completion of punch list items prior to the designated <br /> physical completion date. <br /> 1.2 FORMAT <br /> A. The Schedule shall be a critical path method Gantt chart style. <br /> B. The Schedule shall clearly identify all work and detailed to show specific steps to perform <br /> work. The relationship between the work items shall show the starting date, length of <br /> time required to perform work, completion of the work within the time frame shown. <br /> C. All work found on the schedule of values shall be clearly identified. Unless otherwise <br /> expressly authorized in writing by the Owner's representative, the Contractor must <br /> integrate the schedules with the Schedule of Values and unit price items so that each <br /> construction activity is represented by a dollar value. <br /> D. Submittals dates shall be included and the relationship between submittal and the work <br /> item shall be identified <br /> E. Materials requiring long lead times shall be clearly identified on the schedule. This shall <br /> include: <br /> 1. Date materials musts be ordered <br /> 2. Time for manufacturing <br /> 3. Time for delivery <br /> 4. Delivery date (expected date materials to be at the project) <br /> 5. Date of Installation <br /> 1.3 SUBMITTAL <br /> A. At the pre-construction meeting, a preliminary schedule is required to be submitted. <br /> Once the preliminary schedule has been approved, the schedule shall become the <br /> Project Schedule. The Project Schedule, as approved by the Owner, will be an integral <br /> part of the contract and will establish interim completion dates for the various activities <br /> under the contract. <br /> B. Schedule shall be submitted electronic. Acceptable format .mmp and pdf. <br /> 01 3216 - 1 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.