My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3529 - 3 <br /> I Evergreen Branch Library Expansion 2017-008 <br /> suppliers. The Health and Safety Rep should be capable of identifying hazards within <br /> the job site, take immediate actions to correct hazard and if needed, stop work until <br /> Ihazards have been corrected. <br /> B. The Contractor shall authorize the Health and Safety Representative to resolve safety- <br /> Irelated issues raised by the Owner. <br /> C. The Health and Safety Representative is responsible to insure that work is performed in <br /> accordance with the Health and Safety Plan. <br /> ID. At the daily job briefing and/or tailgate conference, Contractor shall provide the Owner's <br /> representative in attendance at the meeting all relevant information on the Work to be <br /> Iperformed, its location, and the equipment to be used. <br /> E. The Contractor is responsible to insure that its workers and subcontractors have all <br /> Isafety equipment required for the Work. <br /> F. Nothing in this Contract shall be construed as imposing any duty upon the Owner or any <br /> of its employees with regard to, or as constituting any express or implied assumption of <br /> I control or responsibility over, Project Site safety, or over any other safety conditions <br /> relating to employees or agents of Contractor or any of its Subcontractors, or the public. <br /> IPART 2 - PRODUCTS (Not Used) <br /> IPART 3 - EXECUTION (Not Used) <br /> IEND OF SECTION 01 3529 <br /> I <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> 01 3529 - 3 HEALTH AND SAFETY <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.