Laserfiche WebLink
I <br /> City of Everett 01 3544 - 1 <br /> I <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 01 3544 - HAZARDOUS MATERIALS PROCEDURES <br /> I <br /> PART 1 - GENERAL <br /> I1.1 SUMMARY <br /> U A. Section Includes: Hazardous materials abatement, Under the Work of this Contract, <br /> including proper remediation of Asbestos Containing Materials, Lead remediation, Light <br /> Fixture Component recycling of fluorescent tubes containing mercury and proper <br /> I disposal of ballasts containing polychlorinated biphenyls (PCB), as well as Biohazard <br /> pre-cleaning and Silica remediation prior to and during demolition, transportation and <br /> proper disposal of construction waste materials removed from the detached Duplex <br /> UBuilding located west of the Evergreen Branch Library at the subject site. <br /> B. Renovation, Selective Demolition and Expansion Work for the Evergreen Branch <br /> Library includes employer compliance with current federal, state and local health and <br /> I safety regulations for construction in the commercial building, Under the Work of the <br /> Contract. Other than methods used to minimize the creation of dust, prompt cleanup <br /> and employer compliance with current regulations to reduce the potential for worker <br /> I exposure to potential hazardous materials, no abatement has been scheduled for the <br /> Evergreen Branch Library building. The building materials surveyed by the Owner for <br /> work scheduled for the Evergreen Branch Library can be found under separate cover in <br /> Ithe Asbestos Good Faith Inspection, EBL, AET 3161.11, 04/25/17. <br /> 1.2 ASBESTOS REMEDIATION <br /> IA. The City of Everett (Owner) has surveyed buildings for the purpose of identifying <br /> asbestos containing materials. The final Asbestos Good Faith Inspection — Addendum <br /> I #1, dated August 30, 2017, identified asbestos containing materials for The Duplex <br /> Building. A copy is included with this specification. A written copy of this survey must <br /> be posted conspicuously at the job site. <br /> IB. The intent and extent of scope of work is identified in the Architectural Drawings and <br /> Project Manual and includes the following Asbestos Remediation Documents: <br /> 1. Specification: Section 02 8200 ASBESTOS REMEDIATION <br /> I 2. Drawing: HZ1.01 HAZMAT COVER SHEET- GENERAL NOTES and HZ1.10 <br /> HAZMAT DUPLEX FLOOR PLANS. <br /> I C. Remediation, including proper abatement, compliance monitoring, removal, and <br /> disposal of asbestos-containing materials are included under the Work of this Contract. <br /> I D. Conform to Authorities Having Jurisdiction for asbestos remediation including PSCAA, <br /> WISHA and EPA regulations. <br /> E. Claims or requests for additional work will not be accepted for any hidden friable or <br /> I non-friable asbestos containing materials identified during abatement and demolition. <br /> The base bid should cover complete abatement of all surfacing material, and any <br /> I01 3544 - 1 HAZARDOUS MATERIALS PROCEDURES <br />