My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 4523 - 7 <br /> ' Evergreen Branch Library Expansion 2017-008 <br /> 1. Submit 1 test with the mix design. <br /> 2. Submit 1 test each week during course of concrete placement. <br /> 3. Test six cubes each test. 3 cubes with wash water and 3 cubes with potable <br /> water. <br /> 4. Conduct chemical tests, 1 per week during course of concrete placemen <br /> F. Sampling for Concrete Compression Tests: <br /> 1. Take representative samples of fresh concrete conforming to ASTM C172 for <br /> each concrete mix delivered to project. <br /> a. No samples are required for less than 5 cubic yards of concrete. <br /> b. Take one sample for placement of 5 to 25 cubic yards. <br /> c. Take one additional sample for each additional 150 cubic yards. <br /> d. Minimum of one sample each day mix is delivered <br /> ' 2. Make and cure test 4 inch by 8 inch test cylinder specimens conforming to ASTM <br /> C31. <br /> ' G. Concrete Compression Tests of Test Cylinders: <br /> 1. Test to ASTM C39 for each concrete mix conforming to following: <br /> Number of Cylinders to be Tested and Broken <br /> Age at Test(Days) Acceptance Age: 56 Days Acceptance Age: 28 Days <br /> 7 1 1 <br /> 28 2 2 <br /> 56 2 <br /> Hold 1 1 <br /> ' 2. Basis for Compliance: <br /> a. Meet or exceed specified compressive strength for average of 3 <br /> ' consecutive strength tests for each concrete mix. <br /> b. Individual strength test average of 2 cylinders does not fall more than 500 <br /> psi below specified compressive strength. <br /> ' 3. Test Report: Indicate exact mix tested, minimum aggregate size, location and <br /> type of concrete placement, cylinder identification, date of receiving test cylinder <br /> in laboratory, cement brand and type, and admixtures used. <br /> H. In Place Concrete Core Tests: Conduct further testing, at Contractor's expense, of <br /> concrete where cylinder test cylinders fall 500 psi below specified compressive <br /> ' strength or where tests of field-cured cylinders indicate deficiencies in protection or <br /> curing. <br /> 1. Testing Procedure: Test to ASTM C42. Take at least three 2 inch diameter core <br /> samples from concrete placement locations considered questionable as directed <br /> by Architect. <br /> t 2. Damaged Core Samples: Replace samples damaged during removal or <br /> subsequent testing with new core sample. <br /> 01 4523 - 7 TESTING AND INSPECTION SERVICES <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.