My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> City of Everett 01 4523 - 8 <br /> Evergreen Branch Library Expansion 2017-008 <br /> 3. Basis for Acceptance: Average compressive strength of core samples at least 85 <br /> percent of that specified and no single core sample less than 75 percent of that <br /> specified. Where not accepted, Structural Engineer analysis and correction of <br /> work will be made at Contractor's expense. <br /> 4. Core Holes: Repair at Contractor's expense using accepted dry pack or specified <br /> non-shrink grout. ' <br /> I. Concrete Slump Tests: Make slump test for each batch delivered and at least 1 test <br /> each hour during continuous placements. Verify that batches are consistent. Test each <br /> batch to ASTM C143. <br /> J. Air Content: Test each set of concrete compression test cylinders to ASTM C231 at <br /> minimum one test each day. <br /> K. Concrete Curing Procedures: Conduct inspections and verify compliance with specified <br /> requirements. ' <br /> L. Anchors: Inspect epoxy anchors and expansion bolts installed in concrete as defined <br /> by IBC Chapter 17. <br /> 1.13 MASONRY CONSTRUCTION TESTS AND INSPECTIONS <br /> A. Structural Masonry: As specified by Division 04 Sections and as required by IBC <br /> Section 17 04.5. <br /> B. Inspect grout spaces and cleanouts, take prism and test samples, inspect after ' <br /> placement of reinforcing steel, and during grouting operations, except as otherwise <br /> permitted by Code. <br /> 1.14 OTHER MISCELLANEOUS TESTS AND INSPECTIONS <br /> A. Special Cases: As required by IBC, as determined by Building Code Official, and as ' <br /> requested by Architect <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 4523 <br /> 01 4523 - 8 TESTING AND INSPECTION SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.