Laserfiche WebLink
1 <br /> City of Everett 01 5000 - 2 <br /> Evergreen Branch Library Expansion 2017-008 I <br /> J. After completion of Work the Contractor shall remove all temporary facilities and shall <br /> restore the temporary facilities area to its original state. <br /> 1.3 MATERIAL DELIVERY AND STORAGE <br /> A. Delivery of materials shall be made only during the Contractor's working hours and at <br /> such times as they have a representative available. <br /> B. The Contractor shall store materials within the work site area at an area determined in <br /> pre-construction conference or designated by the Owner. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) ' <br /> END OF SECTION 01 5000 ' <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> I <br /> 1 <br /> 01 5000 - 2 TEMPORARY FACILITIES AND CONTROLS <br /> 1 <br />