My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 5500 - 1 <br /> IEvergreen Branch Library Expansion 2017-008 <br /> SECTION 01 5500 -VEHICULAR ACCESS AND PARKING <br /> I <br /> PART 1 - GENERAL <br /> 1.1 DESCRIPTION <br /> I A. Provide labor, signs, and other traffic control devices, for performing traffic control <br /> procedures needed for the protection of the Work and the Public. <br /> I1.2 RELATED REQUIREMENTS <br /> A. Not Applicable <br /> 1.3 REFERENCES <br /> IA. MUTCD - Manual on Uniform Traffic Control Devices for Streets and Highways City of <br /> Everett Design and Construction Standards (current edition) <br /> I1.4 CONSTRUCTION TIO UNDER TRAFFIC <br /> A. The Contractor shall be responsible for first aid; the safety, efficiency, and adequacy of <br /> the Contractor's plant, Equipment, and method of construction; and for any damage or <br /> injury resulting from the failure, improper maintenance, use or operation of such plant or <br /> IEquipment or method of operation. <br /> B. Notifications Relative to Contractor's Activities: <br /> I 1. The Contractor shall plan and schedule Contractor work activities to conform to <br /> and allow time for notifications, approvals, reviews, and other conditions of the <br /> Contract Documents. <br /> a. For Work That Partially or Completely Restricts Any Arterial, Street, <br /> Sidewalk, or Alley <br /> b. Disruptions to, or service modification requests for, Everett transit service <br /> c. Property access restrictions <br /> d. Emergency Work for Pavement or Sidewalk Problems <br /> C. The Contractor shall: <br /> I1. Conduct all operations with the least possible obstruction and inconvenience to the <br /> public. <br /> 2. Have under construction no greater length or amount of work than can be <br /> I continuously and vigorously prosecuted properly with due regards to the rights of <br /> the public. <br /> 3. To the extent possible, finish each section before beginning work on the next. <br /> 4. Minimize the disruption of public traffic by: <br /> I <br /> I01 5500 - 1 VEHICULAR ACCESS AND PARKING <br />
The URL can be used to link to this page
Your browser does not support the video tag.