My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 6325 - 1 <br /> Evergreen Branch Library Expansion 2017-008 <br /> SECTION 00 6325 - SUBSTITUTION REQUEST FORM <br /> ' PROJECT: Evergreen Branch Library — Expansion REQUEST NO.: <br /> ' CONTRACTOR: DATE: <br /> We hereby submit for consideration, following product instead of specified item for <br /> ' above project: <br /> Section Specified Item <br /> Proposed Substitution <br /> 1 Attach complete technical data, including laboratory tests, and samples, as applicable. <br /> Attach detailed comparison of the significant qualities (size, weight, durability, <br /> performance and similar characteristics, and including visual effect where applicable) for <br /> the proposed substitution in comparison with the original requirements. <br /> List complete installation changes and changes to Drawings and Specifications required <br /> by proposal. <br /> Fill in Blanks Below: <br /> A. Does substitution require change in Drawing dimensions? <br /> B. Will Undersigned pay for resulting building design changes including engineering <br /> 11 I and detailing costs? <br /> ' C. What effect does substitution have on other trades? <br /> D. Differences between proposed substitution and specified item? <br /> E. Manufacturer's guarantees of proposed and specified items are: <br /> Same Different (Explain on attachment) <br /> F. Name and address of three (3) similar projects on which product was used, and <br /> date of installation <br /> G. Contract completion date is: Same Different (Explain on attachment). <br /> H. Cost Savings? <br /> I <br /> 00 6325 - 1 SUBSTITUTION REQUEST FORM <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.