My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/10/2019
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2019
>
Faber Construction Corporation 1/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 8:55:02 AM
Creation date
1/17/2019 9:47:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/10/2019
Council Approval Date
11/28/2018
End Date
10/1/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Tracking Number
0001602
Total Compensation
$4,671,026.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
FABER CONSTRUCTION CORPORATION 3/25/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
FABER CONSTRUCTION CORPORATION 7/15/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 6325 - 2 <br /> Evergreen Branch Library Expansion 2017-008 <br /> Undersigned attests function and quality equivalent or superior to specified item and waives his <br /> rights to additional payment and time which may subsequently be necessitated, by failure of the <br /> substitution to perform adequately, and for the required work to make corrections thereof. ' <br /> Signature must be by a person having authority to legally bind his firm to the above terms. <br /> Failure to provide legally-binding signature will result in approval retraction. <br /> Submitted by: <br /> Signature Date i <br /> Printed , <br /> Firm , <br /> Address ' <br /> Telephone ' <br /> For use by Architect/Engineer: <br /> Accepted Accepted as Noted Not Accepted Received Too <br /> Late <br /> BY: Date: <br /> Remarks: <br /> For use by Owner: , <br /> Accepted Accepted as Noted Not Accepted Received Too Late <br /> I <br /> Project Manager Date <br /> Remarks: ' <br /> END OF SECTION 00 6325 <br /> I <br /> 00 6325 - 2 SUBSTITUTION REQUEST FORM <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.