Laserfiche WebLink
e ' N <br /> 2. The A-3 use appears to be a B occupancy with a higher calculated occupant load, per IBC 303.1.2. <br /> Please clarify how the A-3 occupancy was determined based on the proposed use. <br /> 3. A discernible path of egress should be shown with illuminated exit signs on the drawings, per IBC <br /> section 1011.1 for building A. <br /> 4. Emergency lighting should be shown on the drawings, per IBC section 1006.1 for building A. <br /> 5. The drawings should indicate specific signage to indicate that egress doors will be open during <br /> business hours, per IBC section 1010.1.9.3, item 2.2. <br /> a. The door schedule should indicate that any locking devices on these doors are readily <br /> distinguishable as being locked. <br /> 6. Please dimension minimum egress widths at interior and exterior exit access aisles. The minimum <br /> exterior width is 44 inches, per IBC section 1101.2.1. <br /> Construction <br /> 1. Please detail skylight design, per IBC section 2405. <br /> 2. Please show primary and secondary roof drainage, per UPC section 1101.1.1. <br /> 3. Please provide plumbing fixture calculations per the Washington State amended IBC Chapter 29. <br /> a. The number of fixtures provided appear to be lower than what is required for the women's <br /> toilet room: 3 water closets appear to be required per IBC table 2902.1, as amended by the <br /> State of Washington. <br /> a. Why do the calculations refer to the OBC? <br /> b. Why is there a reference to the actual occupant load, when the calculated occupant load <br /> should be used for determining exits, plumbing fixtures, etc.? <br /> Accessibility <br /> 1. The building permit set should indicate the accessible route and vertical signage for visitor and <br /> employee van and standard accessible parking. <br /> a. The current location of accessible parking does not meet the requirements of IBC 1106.6, as <br /> amended by the State of Washington, which requires accessible parking to be located on the <br /> shortest route to the facility served. The PUP parking has been given precedence in <br /> proximity to building A. <br /> b. Please provide grading sections or site elevations from the accessible parking on site plan <br /> C6.0 to verify the accessible route requirements have been met. <br /> c. Signage should be shown on the drawings to make a distinction between van and standard <br /> accessible parking, with the bottom of the sign not less than 5'-0"from the parking surface, <br /> per ICC A117.1-2009 section 502.7. <br /> d. The total number of accessible parking spaces, based on the passenger parking provided, <br /> should be summarized on the plans, per the International Building Code (IBC) table 1106.1, <br /> to include the specific number of van and standard accessible parking spaces, per IBC <br /> section 1106.5. <br /> 2. Please provide enlarged plans and elevations of the toilet rooms (reference City of Everett checklist). <br /> a. Toilet room DF-4 should be shown to be accessible, with a five foot clearance between the <br /> lavatory and the wall, per ICC A117.1-2009 section 604.3. <br /> 3. Doors should indicate an 18 inch pull side dimension, per ICC A117.1-2009 figure 402.3.2 (a). <br /> a. Reference sheet A4.05 door L/II, M/5, F/11, E/11 on sheet A1.11. <br /> b. A 12 inch push side clearance dimension is required if there is a closer and a latch, per ICC <br /> A117.1-2009 figure 402.3.2 (b). Reference sheet A4.05 door #(?) near hallway 113. <br /> c. Please identify accessible hardware on door schedule, per IBC section 1010.1.9.1. <br /> d. Please dimension vision lite on door elevations to meet A117.1-2009 section 404.2.10. <br /> Energy <br /> CITY OF EVERETT BUILDING DEPARTMENT 3200 CET, EVERETT, WA 98201 425-257-8810 <br /> website:www.everettwa.pov/permit email: everetteps(a�everettwa.gov <br />