Project: Legion Golf Course Stormwater Detention Project <br /> Change Order No. 1 <br /> Change Order Effective Date: November 6, 2018 <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> al/Aa Oc- <br /> Mayor <br /> City Clerk b City Attorney <br /> Date: 12,/1g/� Date: /2-/f1/a-o/f )2//9/0/W <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> ZvtlAcij2- A (41 <br /> / 1 <br /> r <br /> Date: /7,-5 -IS P ate: /'- J a 4 ate: / / 0 Date: 1 /2-ACT S, <br /> CONTRACTOR <br /> Date: 1 '2 -- 18 <br /> Officer <br /> Page 2 of 3 <br />