My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
>
Contracts
>
Capital Contract
>
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 11:28:02 AM
Creation date
1/23/2019 11:27:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RODARTE CONSTRUCTION INC
Approval Date
12/18/2018
Department
Public Works
Department Project Manager
DAVE VOIGT
Subject / Project Title
GOLF COURSE STORMWATER DENTENTION
Public Works WO Number
UP3620
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001067
Total Compensation
$235,330.75
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 2/14/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Legion Golf Course Stormwater Detention Project <br /> Change Order No. 1 <br /> Change Order Effective Date: November 6, 2018 <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> al/Aa Oc- <br /> Mayor <br /> City Clerk b City Attorney <br /> Date: 12,/1g/� Date: /2-/f1/a-o/f )2//9/0/W <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> ZvtlAcij2- A (41 <br /> / 1 <br /> r <br /> Date: /7,-5 -IS P ate: /'- J a 4 ate: / / 0 Date: 1 /2-ACT S, <br /> CONTRACTOR <br /> Date: 1 '2 -- 18 <br /> Officer <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.