Laserfiche WebLink
CHANGE ORDER#2 COSTS <br /> Bid Item No. Bid Item Unit Unit Price Quantity Total Cost <br /> Cement Concrete Pavement Removal, <br /> A-103 Including Haul& Disposal Tons $31.50 245.00 $7,717.50 <br /> A-104 Roadway Excavation, Including Haul Tons $60.00 146.00 $8,760.00 <br /> A-105 Cement Concrete Curb Ramp Each $2,900.00 5.00 $14,500.00 <br /> A-106 Cement Concrete Pavement CY $345.00 145.00 $50,025.00 <br /> A-107 Additional Cement Concrete Sidewalk SY $95.00 300.00 $28,500.00 <br /> A-2 Traffic Control Labor HR $66.00 250.00 $16,500.00 <br /> Total Cost of Change Order No.2 $126,002.50 <br />