My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
>
Contracts
>
Capital Contract
>
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 11:53:50 AM
Creation date
1/23/2019 11:53:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
INTERWEST CONSTRUCTION INC.
Approval Date
12/4/2018
Department
Public Works
Department Project Manager
HEATHER GRIFFIN
Subject / Project Title
GRAND AVENUE PARK BRIDGE
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
9
Tracking Number
0000801
Total Compensation
$13,855,462.69
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THOMPSON <br /> 360-696-0811 1360-693-1017 fax I TMFAB.COM <br /> MAILING: P.O. Box 5276,Vancouver,WA 98668 <br /> PHYSICAL: 3000 SE Hidden Way,Bldg 40,Vancouver,WA 98661 <br /> 6/5/2018 <br /> Attention: Izaak Fox <br /> Reference: Grand Ave. Pedestrian Bridge (TMF Job 24217, Interwest PO No. 1157-02) <br /> Subject: TMF CCO 24217-009, Rev.0 <br /> Narrative:This work is to add a couple of X3/4"drip holes to east side of the bottom chord joints L1 through L15 <br /> North and South trusses in PL 1/2",as shown in the attached PDF <br /> Labor covers working on 30 members @ 1 MH/EA* $72/MH =$2,160.00. <br /> Tooling—One 3/" Hogan Drill bit with TMF markup=$49.20 <br /> Change Order Value <br /> CCO 24217-007 Rev. 1 TOTAL $2,220.92 <br /> Resolution on this claim is a priority and we would like to work with you on any questions you may have or further <br /> analysis you require.We recognize Interwest as an extremely valuable customer and we are committed to the <br /> success of the project and our relationship. Conference calls, emails and face-to-face visits are welcomed to <br /> resolve this matter in a timely fashion. <br /> Best Regards, <br /> David Rosenstiel <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.